London Banter

London Banter (https://www.londonbanter.co.uk/forum.php)
-   London Transport (https://www.londonbanter.co.uk/london-transport/)
-   -   Thameslink / Southeastern timetable consultation (https://www.londonbanter.co.uk/london-transport/15120-thameslink-southeastern-timetable-consultation.html)

Basil Jet[_4_] September 20th 16 06:17 PM

Thameslink / Southeastern timetable consultation
 

They've figured out that all this new track they've been planning since
the 1980s and have almost finished building won't actually work.

http://www.southernrailway.com/your-...-consultation/

Discussion at
http://www.londonreconnections.com/2...via-greenwich/

Recliner[_3_] September 20th 16 10:07 PM

Thameslink / Southeastern timetable consultation
 
Basil Jet wrote:

They've figured out that all this new track they've been planning since
the 1980s and have almost finished building won't actually work.

http://www.southernrailway.com/your-...-consultation/

Discussion at
http://www.londonreconnections.com/2...via-greenwich/


Well, they've realised that the currently planned high frequency timetable
is slightly too ambitious, not that the new track won't work.



All times are GMT. The time now is 03:38 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2006 LondonBanter.co.uk