![]() |
TfL wish list
RAIL has a sizeable article about TfL's aspirations. Most of it is
fairly predictable, but a few items stuck out. *Improvements on the Greenford to West Ruislip corridor Huh? If they are talking about Chiltern's aspirations to run to Old Oak Common, wouldn't they say "South Ruislip to Acton Wells" or something similar? Aren't the existing Central Line trains underused? Is TfL planning to take over the West Ealing Greenford shuttle and extend it to West Ruisip? Wouldn't it make more sense to extend it to Uxbridge (although it would probably have to cross the Central Line a second time)? *24tph on the East London Line Where would they go? Would 12tph turn at New Cross? Are there paths available on the other branches? Will they add Wimbledon and Sutton branches via Streatham? Actually, transferring the entire Wimbledon Loop service to the ELL might give a better match between train length and demand, compared to the 8 carriage Thameslink service: so long as Streatham kept a frequent Thameslink service for passengers from the loop to Farringdon to interchange there. * Crossrail 3 No details given. Maybe everyone is so familiar with this that it can be just mentioned with no further explanation, but I'm not. |
TfL wish list
|
TfL wish list
On Wednesday, 26 April 2017 20:47:40 UTC+1, Basil Jet wrote:
RAIL has a sizeable article about TfL's aspirations. Most of it is fairly predictable, but a few items stuck out. *Improvements on the Greenford to West Ruislip corridor *24tph on the East London Line * Crossrail 3 I am guessing but I expect the West Ruislip - Greenford reference is about raising track and junction capacity on this section. If throw in aspirations about through trains to West Ealing or Heathrow plus extra trains down the NNL to Old Oak Common on top of Chiltern's existing services you have a bottleneck in that area. North of W Ruislip is beyond TfL's remit so they'll leave that to the DfT to resolve. I understand TfL want 6 tph to Crystal Palace and 6 tph to Clapham Junction via Peckham. That takes total tph to 20 on the ELL core. I think 24 tph is simply an infrastructure capacity aspiration. If you invest in signalling and control then you'd go to 24 tph using ATO. I think that is what TfL are referring to and it's been their view for quite a while. They have no public aspiration to take over any bits of Thameslink and, as said by Colin, the local campaigns in S London killed off any common sense about Thameslink's service pattern a long time ago. Crossrail 3 is a SE to NW cross London tunnelled line. It's been mentioned as the next big intervention to try to "fix" rail capacity issues in SE London. Some Assembly politicians are naturally very keen on this and the TfL Commissioner has mentioned it. Beyond that there is no detail. TfL have to get CR2 to the starting blocks and I fear that is going to be immensely difficult. -- Paul C via Google |
All times are GMT. The time now is 03:52 PM. |
Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2006 LondonBanter.co.uk