London Banter

London Banter (https://www.londonbanter.co.uk/forum.php)
-   London Transport (https://www.londonbanter.co.uk/london-transport/)
-   -   GOBLIN: FURTHER ELECTRIFICATION WORK. (https://www.londonbanter.co.uk/london-transport/15333-goblin-further-electrification-work.html)

Robin9 October 18th 17 09:13 AM

I assume there is a good reason for splitting the blockade
in two instead of just continuing the first until the entire
job has been done? This on again/off again train service is
highly irritating.

Robin9 November 27th 17 02:29 PM

I've just walked along Leyton High Road at the point where
GOBLIN crosses overhead. I was very pleased to see wires
being hung. It seems this time Network Rail really will get
the job done.


All times are GMT. The time now is 10:19 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2006 LondonBanter.co.uk