As expected, TfL has started the procurement process to replace
two-thirds of the DLR fleet (the B90, B92 and B2K sets), plus extra stock to increase services. The 43 new generation articulated trains, entering service from 2022, will be single 87m units, equivalent to three of the current two-section units (which is how most DLR trains runs now). https://www.globalrailnews.com/2017/...railway-fleet/ |
#2
![]() |
|||
|
|||
![]()
On Wed, 17 May 2017 15:17:11 +0100
Recliner wrote: As expected, TfL has started the procurement process to replace two-thirds of the DLR fleet (the B90, B92 and B2K sets), plus extra stock to increase services. The 43 new generation articulated trains, entering service from 2022, will be single 87m units, equivalent to three of the current two-section units (which is how most DLR trains runs now). Why do light rail and tram vehicles seem to have a much shorter shelf life than heavy rail trains? Is it build quality? The DLR trains seem in fairly good nick to me, I can't see any pressing need as a passenger for them to be replaced. -- Spud |
#3
![]() |
|||
|
|||
![]()
wrote:
On Wed, 17 May 2017 15:17:11 +0100 Recliner wrote: As expected, TfL has started the procurement process to replace two-thirds of the DLR fleet (the B90, B92 and B2K sets), plus extra stock to increase services. The 43 new generation articulated trains, entering service from 2022, will be single 87m units, equivalent to three of the current two-section units (which is how most DLR trains runs now). Why do light rail and tram vehicles seem to have a much shorter shelf life than heavy rail trains? Is it build quality? The DLR trains seem in fairly good nick to me, I can't see any pressing need as a passenger for them to be replaced. I don't know if there are any maintenance issues with the current stock, but having the new stock built as single articulated units increases capacity and flexibility, allowing the attendant to access the entire length of the train at any time. The old DLR stock may have second-value if they're in good nick, just as the original stock did. For example, I wonder if the T&W Metro could use them? The current Metro stock is much older, and is due to be replaced in a few years, just when the DLR trains could be available. |
#4
![]() |
|||
|
|||
![]()
On Thu, 18 May 2017 20:02:59 -0000 (UTC), Recliner
wrote: wrote: On Wed, 17 May 2017 15:17:11 +0100 Recliner wrote: As expected, TfL has started the procurement process to replace two-thirds of the DLR fleet (the B90, B92 and B2K sets), plus extra stock to increase services. The 43 new generation articulated trains, entering service from 2022, will be single 87m units, equivalent to three of the current two-section units (which is how most DLR trains runs now). Why do light rail and tram vehicles seem to have a much shorter shelf life than heavy rail trains? Is it build quality? The DLR trains seem in fairly good nick to me, I can't see any pressing need as a passenger for them to be replaced. I don't know if there are any maintenance issues with the current stock, but having the new stock built as single articulated units increases capacity and flexibility, allowing the attendant to access the entire length of the train at any time. The old DLR stock may have second-value if they're in good nick, just as the original stock did. For example, I wonder if the T&W Metro could use them? The current Metro stock is much older, and is due to be replaced in a few years, just when the DLR trains could be available. An interesting thought. One of the 1st batch, (car no. 11?) was fitted with a pantograph for "Metrolink publicity trails" in Manchester many years ago. T&W 's 1.5kV operating voltage might be a problem though? DC --- This email has been checked for viruses by Avast antivirus software. https://www.avast.com/antivirus |
#5
![]() |
|||
|
|||
![]()
David C wrote:
On Thu, 18 May 2017 20:02:59 -0000 (UTC), Recliner wrote: wrote: On Wed, 17 May 2017 15:17:11 +0100 Recliner wrote: As expected, TfL has started the procurement process to replace two-thirds of the DLR fleet (the B90, B92 and B2K sets), plus extra stock to increase services. The 43 new generation articulated trains, entering service from 2022, will be single 87m units, equivalent to three of the current two-section units (which is how most DLR trains runs now). Why do light rail and tram vehicles seem to have a much shorter shelf life than heavy rail trains? Is it build quality? The DLR trains seem in fairly good nick to me, I can't see any pressing need as a passenger for them to be replaced. I don't know if there are any maintenance issues with the current stock, but having the new stock built as single articulated units increases capacity and flexibility, allowing the attendant to access the entire length of the train at any time. The old DLR stock may have second-value if they're in good nick, just as the original stock did. For example, I wonder if the T&W Metro could use them? The current Metro stock is much older, and is due to be replaced in a few years, just when the DLR trains could be available. An interesting thought. One of the 1st batch, (car no. 11?) was fitted with a pantograph for "Metrolink publicity trails" in Manchester many years ago. The original P86 and P89 DLR trains were later fitted with pans and cabs: https://youtu.be/hr_PtAIuD90 T&W 's 1.5kV operating voltage might be a problem though? I'd have thought that would be easily dealt with. |
#6
![]() |
|||
|
|||
![]()
On Fri, 19 May 2017 07:26:37 -0000 (UTC)
Recliner wrote: David C wrote: The old DLR stock may have second-value if they're in good nick, just as the original stock did. For example, I wonder if the T&W Metro could use them? The current Metro stock is much older, and is due to be replaced in a few years, just when the DLR trains could be available. They're the right size, but whether the geordies would want 2nd hand cast offs from London is another matter entirely. T&W 's 1.5kV operating voltage might be a problem though? I'd have thought that would be easily dealt with. If it was AC yes - you change or re-tap the transformer, job done. DC I suspect is not so simple. I imagine a lot of the front end power electronics would have to be replaced. -- Spud |
#7
![]() |
|||
|
|||
![]()
On 19.05.17 8:26, Recliner wrote:
David C wrote: On Thu, 18 May 2017 20:02:59 -0000 (UTC), Recliner wrote: wrote: On Wed, 17 May 2017 15:17:11 +0100 Recliner wrote: As expected, TfL has started the procurement process to replace two-thirds of the DLR fleet (the B90, B92 and B2K sets), plus extra stock to increase services. The 43 new generation articulated trains, entering service from 2022, will be single 87m units, equivalent to three of the current two-section units (which is how most DLR trains runs now). Why do light rail and tram vehicles seem to have a much shorter shelf life than heavy rail trains? Is it build quality? The DLR trains seem in fairly good nick to me, I can't see any pressing need as a passenger for them to be replaced. I don't know if there are any maintenance issues with the current stock, but having the new stock built as single articulated units increases capacity and flexibility, allowing the attendant to access the entire length of the train at any time. The old DLR stock may have second-value if they're in good nick, just as the original stock did. For example, I wonder if the T&W Metro could use them? The current Metro stock is much older, and is due to be replaced in a few years, just when the DLR trains could be available. An interesting thought. One of the 1st batch, (car no. 11?) was fitted with a pantograph for "Metrolink publicity trails" in Manchester many years ago. The original P86 and P89 DLR trains were later fitted with pans and cabs: https://youtu.be/hr_PtAIuD90 T&W 's 1.5kV operating voltage might be a problem though? I'd have thought that would be easily dealt with. Do you think that Vivarail might be interested in them? Or do we need to see how the 230s first work out before they can consider that? |
#8
![]() |
|||
|
|||
![]()
On 18/05/2017 21:02, Recliner wrote:
allowing the attendant to access the entire length of the train at any time. Uh oh - I foresee threats of industrial action shortly (before anyone suggests I'm being unfair, this is exactly what happened when the DLR went to three units) |
#9
![]() |
|||
|
|||
![]()
wrote:
On Wed, 17 May 2017 15:17:11 +0100 Recliner wrote: As expected, TfL has started the procurement process to replace two-thirds of the DLR fleet (the B90, B92 and B2K sets), plus extra stock to increase services. The 43 new generation articulated trains, entering service from 2022, will be single 87m units, equivalent to three of the current two-section units (which is how most DLR trains runs now). Why do light rail and tram vehicles seem to have a much shorter shelf life than heavy rail trains? Is it build quality? The DLR trains seem in fairly good nick to me, I can't see any pressing need as a passenger for them to be replaced. More in this: https://www.londonreconnections.com/2017/bakerloo-deja-vu-buying-new-trains-for-the-dlr/ It seems the trains only had a 25 year design life, are used very intensively, and do now need structural work to stay in service: http://www.plantengineer.org.uk/plant-engineer-news/refurbishment-underway-for-docklands-light-railway/154830/ |
#10
![]() |
|||
|
|||
![]()
On Fri, 19 May 2017 08:55:38 -0000 (UTC)
Recliner wrote: wrote: On Wed, 17 May 2017 15:17:11 +0100 Recliner wrote: As expected, TfL has started the procurement process to replace two-thirds of the DLR fleet (the B90, B92 and B2K sets), plus extra stock to increase services. The 43 new generation articulated trains, entering service from 2022, will be single 87m units, equivalent to three of the current two-section units (which is how most DLR trains runs now). Why do light rail and tram vehicles seem to have a much shorter shelf life than heavy rail trains? Is it build quality? The DLR trains seem in fairly good nick to me, I can't see any pressing need as a passenger for them to be replaced. It seems the trains only had a 25 year design life, are used very intensively, and do now need structural work to stay in service: http://www.plantengineer.org.uk/plan...t-underway-for docklands-light-railway/154830/ As usual the buy-it-on-the-cheap approach comes back to bite them. You'd have thought they'd have learnt their lesson with the 92 stock. The other document mentions a strenuous life for the trains, can't see it myself. There are far older trams ploughing up and down far steeper inclines around europe that don't have a nice reserved right of way. -- Spud |
Reply |
|
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
The Fleet Line - Don't Jubilee've It! | London Transport | |||
OT - Beautiful pictures of the River Fleet | London Transport | |||
Routing enquiry - Fleet to London Terminals | London Transport | |||
Fleet Line? | London Transport | |||
Fleet Maintenance Pro v9.0.19 Enterprise 100 users, STRACfastMaintenance 2.5c, Auto Maintenance Pro v9.0 Professional Incl Keygen,various other AUTO and BOAT Maintenance progs ... | London Transport |