Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#5
![]() |
|||
|
|||
![]()
Am 26.04.2019 um 08:42 schrieb Recliner:
It was reported a couple of weeks ago that they'd used "the wrong type of concrete" for some of the construction, and implied they were having to chip that out and replace it. Ah, I hadn't seen that, perhaps because I was away. It does sound like a beginner's mistake, hardly to be expected in a flagship project like that. Oh, in Germany, "we" made that mistake with the concrete sleepers for several lines renovated to high-speed standard in the 1990's; they were happy to renovate Halle-Berlin a second time some 10 years later. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Enlarged Bond Street station opened | London Transport | |||
Bond Street 3D | London Transport | |||
Victoria Tube station escalator works finished | London Transport | |||
Bond Street after 11pm? | London Transport | |||
Bond Street night work at the back of the jubilee southbound | London Transport |