London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #5   Report Post  
Old April 29th 19, 09:59 AM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Apr 2019
Posts: 13
Default Crossrail to be finished without Bond Street 'by March 2021'

Am 26.04.2019 um 08:42 schrieb Recliner:
It was reported a couple of weeks ago that they'd used "the wrong type
of concrete" for some of the construction, and implied they were having
to chip that out and replace it.


Ah, I hadn't seen that, perhaps because I was away. It does sound like a
beginner's mistake, hardly to be expected in a flagship project like that.


Oh, in Germany, "we" made that mistake with the concrete sleepers for
several lines renovated to high-speed standard in the 1990's; they were
happy to renovate Halle-Berlin a second time some 10 years later.




 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Enlarged Bond Street station opened Basil Jet[_4_] London Transport 19 November 26th 17 05:32 PM
Bond Street 3D lonelytraveller London Transport 3 February 20th 12 11:09 AM
Victoria Tube station escalator works finished Mizter T London Transport 6 October 18th 11 09:43 PM
Bond Street after 11pm? No Name London Transport 0 August 27th 11 09:03 AM
Bond Street night work at the back of the jubilee southbound Mystery Flyer London Transport 0 January 16th 07 09:41 PM


All times are GMT. The time now is 02:54 PM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017