Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
"Roads minister Baroness Vere, who heads the task force, told
the meeting that a full repair of the bridge would take six and a half years, more than twice as long as previously feared. It also emerged that a ferry service to allow pedestrians to cross the Thames will not start operating until the spring. https://www.standard.co.uk/news/lond...ridge-shut-to- traffic-until-2027-ferry-crossing-a4573392.html -- Roland Perry |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
7 coats of arms on Hammersmith Bridge | London Transport | |||
Hammersmith flyover closed for three weeks from Aug 1st | London Transport | |||
Hammersmith flyover closed for three weeks from Aug 1st | London Transport | |||
Hammersmith flyover closed for three weeks from Aug 1st | London Transport | |||
Hammersmith flyover closed for three weeks from Aug 1st | London Transport |