London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Old October 29th 20, 02:44 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Aug 2003
Posts: 10,125
Default Hammersmith Bridge

"Roads minister Baroness Vere, who heads the task force, told
the meeting that a full repair of the bridge would take six and
a half years, more than twice as long as previously feared.

It also emerged that a ferry service to allow pedestrians to
cross the Thames will not start operating until the spring.

https://www.standard.co.uk/news/lond...ridge-shut-to-
traffic-until-2027-ferry-crossing-a4573392.html
--
Roland Perry
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
7 coats of arms on Hammersmith Bridge Basil Jet London Transport 16 July 19th 09 04:15 PM
Hammersmith flyover closed for three weeks from Aug 1st Oliver Keating London Transport 8 July 21st 03 02:21 PM
Hammersmith flyover closed for three weeks from Aug 1st AstraVanMan London Transport 0 July 13th 03 09:11 AM
Hammersmith flyover closed for three weeks from Aug 1st kedron London Transport 0 July 12th 03 11:27 PM
Hammersmith flyover closed for three weeks from Aug 1st Oliver Keating London Transport 0 July 12th 03 10:12 PM


All times are GMT. The time now is 03:20 PM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017