Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
The latest short-term DfT funding settlement for TfL yet again obliges the
latter to pursue the Johnson hobby horse of 'driverless trains'. In particular, the DfT wants DLR-style automation to be investigated on the Drain and Piccadilly lines: Driverless Trains 11.TfL's record of modernisation and innovation should not leave it behind other European networks, which are achieving significant operational efficiencies through Driverless Trains. Accordingly, DfT will lead a joint programme with TfL on the implementation of Driverless Trains on the London Underground. 12.Working with DfT, TfL will make sufficient progress towards the conversion of at least one Underground line to Grade-of-Automation 3 (driverless, but with an on-board attendant, as on the Docklands Light Railway), subject to a viable business case and its statutory responsibilities. To achieve this DfT and TfL will produce a Full Business Case for the Waterloo & City Line within 12 months and for the Piccadilly Line within 18 months. Progress towards this milestone during the 2021 Funding Period will be measured by the Oversight Group and will be as follows: a. Delivery of at least interim OBC on Waterloo and City line by the end of the 2021 funding period. b. Delivery of at least interim SOBC on Piccadilly line by the end of the 2021 funding period. c. Market engagement into alternative platform edge protection technology, to be led by TfL and completed by 30 November 2021. d. Design work on rolling stock specification, new signalling, and Platform Edge Doors (PEDs). DfT and TfL will also conduct a full review of the potential for the implementation of GoA3 on the rest of the network. The review will conclude within the next twelve months. DfT’s assessment of progress made towards conversion will factor into agreeing any longer-term funding settlement in the future. https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/990488/tfl-extraordinary-funding-and-financing-settlement-letter-1-june-2021.pdf ————— But London Reconnections is rather sceptical about the whole Johnsonian vision of union-busting driverless trains. And it quotes one former London mayor: “I would rather prioritise capacity… I would rather put the investment into expanding the ability of our underground system to carry people in comfort, than in putting money now into creating a new breed of driverless train.” t https://www.londonreconnections.com/2021/the-political-myth-of-the-driverless-tube-train/ |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Paris Metro chiefs back introduction of driverless Tube trains to London | London Transport | |||
Driverless Trains | London Transport | |||
London Assembly Tories propose driverless Tube trains | London Transport | |||
Driverless trains installed at Terminal 5 | London Transport | |||
Driverless trains. | London Transport |