London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Old August 23rd 04, 12:07 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Aug 2004
Posts: 7
Default Crossrail and the GWML

Hi all,

Just had a look at the Crossrail website, it has information sheets for
each station along the route. Below is a summary of most of the
information for the GWML stations:

All Peak Frequencies:

· 4tph from Acton Main Line to Central London (direct services to
Heathrow and the West).

· 10tph from Ealing Broadway to Central London.

· 4tph from West Ealing to Central London (direct services to Heathrow
and the West).

· 2tph from Hanwell to Central London (direct services to Heathrow and
the West).

· 10tph from Southall to Central London.

· 10tph from Hayes & Harlington to Central London.

· 6tph from West Drayton to Central London.

· 2tph from Iver to Central London.

· 4tph from Langley to Central London.

· 4tph from Slough to Central London.

· 4tph from Burnham to Central London.

· 2tph from Taplow to Central London.

· I am assuming 4tph from Maidenhead to Central London, and 4tph goes to
Heathrow.

Train stabling facilities at West Drayton Yard (former coal depot) – 22
Trains. Facilities at Maidenhead in former goods Yard – 6 trains.
Reversing Sidings at Maidenhead (2). 12 trains at Old Oak Depot (north
of First Great Western’s depot).

Overhead wiring would be undertaken at Maidenhead Bridge (Grade II
listed structure)

At West Drayton platforms 3, 4 and 5 would be extended for Crossrail.
Land would be acquired between Langley and West Drayton to allow for a
fifth track here for the express Crossrail service to overtake (the
route is five track in places at the moment).

At Maidenhead there would be a new terminal platform for the Bourne End
branch. At West Ealing there would be a terminal platform for the
Greenford service. However the Greenford – West Ealing service would
increase to 4tph to make up for the truncation.


Jeff.


--
Posted via Mailgate.ORG Server - http://www.Mailgate.ORG
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Heathrow to western GWML link under consideration 1506[_2_] London Transport 200 November 1st 11 08:26 AM
Boris: Crossrail not yet "signed, sealed and delivered" [was:Transport Secretary vows to finish Crossrail] E27002 London Transport 2 May 21st 10 06:13 PM
Optimum configuration of Crossrail (Was: Diesel Electric Trains on CrossRail) Aidan Stanger London Transport 3 August 12th 04 06:12 PM
Optimum configuration of Crossrail (Was: Diesel Electric Trains on CrossRail) [email protected] London Transport 3 August 9th 04 03:06 PM
I've been to London for business meetings and told myself that I'd be back to see London for myself. (rather than flying one day and out the next) I've used the tube briefly and my questions a Stuart Teo London Transport 4 January 30th 04 03:57 PM


All times are GMT. The time now is 12:11 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017