Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#11
![]() |
|||
|
|||
![]()
In message , David Bradley
writes At the top of the thread it was stated the extension will go ahead - sounds more like an election promise that won't be delivered within Ken's new term of office, assuming he is elected. Well, the election's not until 2008 so, if he stands for a third term, that would take us to 2012. I'd hope it would be finished by then. -- Michael Parry Tony Blair MP Anagram I'm Tory plan B |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Why did Thameslink by-pass Crystal Palace? | London Transport | |||
New Cross gate to West Croydon/Crystal Palace | London Transport | |||
ELL works at Croydon and Crystal Palace | London Transport | |||
Bus Route 3 Oxford Circus - Crystal Palace | London Transport | |||
Crystal Palace solution | London Transport |