London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Old February 3rd 05, 11:46 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 20
Default Work at New Cross Gate Underground platform

Martin J wrote:

Does anyone know why the junk yard next
to the East London line platform at
New Cross Gate has finally been cleared
and some trackside work is going on?
Is this related to East London Line extension?


I wouldn't have thought so, as, AFAIK, the southern extension hasn't
got funding as yet. And also, AFAIK, the track will just be extended
southbound alongside the existing railway lines; the northbound track
coming from Brockley will go through New Cross Gate then there'll be a
flyover across the railway to connect it to the existing tube line.

So no idea really why the junk yard is being cleared!

Patrick
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
New Cross Gate to Shepherd's Bush via Crystal Palace Dr. Sunil London Transport 12 May 29th 10 02:18 PM
New Cross gate to West Croydon/Crystal Palace ce07 London Transport 2 October 4th 09 07:38 PM
New Cross Gate Oyster MIG London Transport 2 September 4th 09 11:17 AM
New Cross Gate Query Paul Scott London Transport 23 June 5th 08 12:10 AM
Work at New Cross Gate Underground platform Martin J London Transport 2 February 7th 05 09:42 PM


All times are GMT. The time now is 01:58 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017