London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #8   Report Post  
Old March 23rd 05, 09:48 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jan 2004
Posts: 263
Default Integrating river services

Dave Arquati wrote:
Aidan Stanger wrote:

Yet they're eager to spend far more on infrastructure projects like the
£40m bus lane on the Thames Gateway Bridge, and the Canary Wharf branch
of Crossrail, which would cost far more than subsidies for boats ever
would. The cost of running boats is on the high side, but so are the
benefits: they can quickly provide plenty of capacity, link communities
N and S of the river, and serve remote parts of London which do not have
bus services (parts of Thamesmead are more than 500m from buses, and
some riverside industrial estates are much further).


Can you get from Heathrow to Canary Wharf by boat? Or from most parts of
West London, Paddington, the West End etc? It's not really relevant to
compare boat subsidies to the cost of Crossrail


It is really relevant to compare them to the cost of THE CANARY WHARF
BRANCH OF Crossrail, as its function would be very similar: providing
capacity to Canary Wharf, and linking communities across the river.

The Canary Wharf branch of Crossrail would only save about ten minutes on
the journey from Heathrow, or W.London, Paddington etc. to Canary Wharf,
compared with Crossrail to Stratford and then a short DLR journey.

I'm not saying such a branch should never be built, but it should be a
lower priority than Crossrail Line 2. Meanwhile, boats can provide the
connectivity at a sensible cost.

- or even the Thames Gateway Bridge for that matter (where did you get the
£40m figure from?).


TfL expect the entire project to cost £400m, and the bus lanes were
expected to come to 10% of the cost. Actually they did say "up to 10%" to
it could be less, though somehow I doubt it. Anyway, it would be an
appalling waste of money, as tolls would ensure that traffic on the
bridge would be free flowing anyway.

Boats won't take you from Thamesmead to Romford, or Abbey Wood
to Barking.

Buses would do that without bus lanes.

Boats can be useful but the river serves a limited catchment area;
interchange is also difficult between river and other modes except at a
few choice locations (although I accept that that can be remedied).

Many locations upstream of Greenwich, and a few town centers downstream!

The problem with the river is that any pier will by its nature only have
half the catchment area of an inland rail/Tube station.


But development density is high enough for that not to be a problem.
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
River services - at a rate of knots Bearded[_2_] London Transport 1 March 17th 10 11:53 AM
Travelcard discounts on river services Simon Bradley London Transport 5 March 13th 10 07:04 AM
River Services Phil London Transport 7 April 30th 07 11:58 AM
River Transport Services - a couple of observations u n d e r a c h i e v e r London Transport 7 April 15th 04 10:52 PM
Cross River Transit 2? Dave Arquati London Transport 6 August 25th 03 11:06 AM


All times are GMT. The time now is 05:29 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017