"Nitro" wrote in message
om...
The benchmark scheme that was approved by Mr Darling yesterday
included two western branches and two eastern one: Heathrow, Kingston,
Shenfield and Ebbsfleet. 24 trains a hour would run in the centre of
London.

snip
Kingston branch: options still have to be selected. If it went via
Acton Central then Churchfield Road Level crossing would close. Other
options see the line going via Chiswick Park or
Turnham Green.


Thanks for this report. I assume it was from the meeting in Ealing Town
Hall this evening.

Re the Kingston branch options:

- Was anything said about the level crossing at Bollo Lane (between South
Acton and Gunnersbury)?

- Do the "other options" re Chiswick Park and Turnham Green still include
the tunnel option (tunnel from the GWML to Chiswick) or has that been ruled
out?
--
Richard J.
(to e-mail me, swap uk and yon in address)



  #2   Report Post  
Old July 16th 03, 10:53 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 6
Default Crossrail Meeting

The bollo road level crossing weren't mentioned although I presume
they would have to close also.

The tunnel remains with the Chiswick Park and Turnham Green options,
there is an option with a striaghtforward tunnel with no station as
well.

Jeffrey Asante

"Richard J." wrote in message ...
"Nitro" wrote in message
om...
The benchmark scheme that was approved by Mr Darling yesterday
included two western branches and two eastern one: Heathrow, Kingston,
Shenfield and Ebbsfleet. 24 trains a hour would run in the centre of
London.

snip
Kingston branch: options still have to be selected. If it went via
Acton Central then Churchfield Road Level crossing would close. Other
options see the line going via Chiswick Park or
Turnham Green.


Thanks for this report. I assume it was from the meeting in Ealing Town
Hall this evening.

Re the Kingston branch options:

- Was anything said about the level crossing at Bollo Lane (between South
Acton and Gunnersbury)?

- Do the "other options" re Chiswick Park and Turnham Green still include
the tunnel option (tunnel from the GWML to Chiswick) or has that been ruled
out?



Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Crossrail 2 meeting in Wimbledon on Monday 7th December Basil Jet[_4_] London Transport 4 December 9th 15 10:01 PM
ROLL (Reopen Lea Valley Line) meeting John Rowland London Transport 1 February 12th 04 07:18 PM
Lea Bridge station reopening - meeting this Wednesday John Rowland London Transport 8 December 24th 03 05:26 PM
Crossrail meeting John Rowland London Transport 1 November 27th 03 11:09 AM
Crossrail Meeting David Randles London Transport 0 July 16th 03 06:33 PM


All times are GMT. The time now is 12:49 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017