London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Old October 7th 05, 09:12 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: May 2005
Posts: 38
Default North Woolwich branch to close


Peter Masson wrote:
wrote

ISTR that the NLL services will be switched to terminate at the High
Level platforms when the route south of Stratford closes - numbers
12/13(?) - which will mean one less of the few stations with mainline
services on two levels.

Will the NLL use these platforms, or will they be used for Lea Valley
trains, with the NLL being provided with new platforms?


A good question: I don't honestly know for certain. At one time there
was a proposal to send NLL trains on beyond Stratford to Walthamstow,
via a reinstated Hall Farm Curve and a new up-side bay at Walthamstow
Central. Obviously if that happens sometime in the future there should
be enough capacity with the existing pair of platforms at Stratford to
handle these and a couple of Lea Valley services per hour.

However, the Hall Farm Curve is certainly not going to happen in the
immediate future, so the NLL trains must terminate at Stratford.
Perhaps the Lea Valley services can use one platform, NLL another? Two
Lea Valley reversers per hour could be handled comfortably, but I'm not
sure about the four NLL services per hour - in theory it's possible,
but fairly tight.

There's no capacity to send NLL trains beyond Stratford up the Lea
Valley line - too many Stansted Expresses wandering around to allow
them to reverse at, for example, Tottenham Hale.

I suspect that some deal to reinstate Hall Farm Curve will come as part
of the Olympic package, reopening Lea Bridge station and possibly with
a new station near the stadium site. Waltham Forest Council is
certainly keen on it, and it would make sense for the post-Olympic
regeneration to open this route up again.

  #2   Report Post  
Old October 9th 05, 12:27 AM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 1,158
Default North Woolwich branch to close

wrote:
Peter Masson wrote:
wrote
ISTR that the NLL services will be switched to terminate at the High
Level platforms when the route south of Stratford closes - numbers
12/13(?) - which will mean one less of the few stations with mainline
services on two levels.

Will the NLL use these platforms, or will they be used for Lea Valley
trains, with the NLL being provided with new platforms?


A good question: I don't honestly know for certain. At one time there
was a proposal to send NLL trains on beyond Stratford to Walthamstow,
via a reinstated Hall Farm Curve and a new up-side bay at Walthamstow
Central. Obviously if that happens sometime in the future there should
be enough capacity with the existing pair of platforms at Stratford to
handle these and a couple of Lea Valley services per hour.

However, the Hall Farm Curve is certainly not going to happen in the
immediate future, so the NLL trains must terminate at Stratford.
Perhaps the Lea Valley services can use one platform, NLL another? Two
Lea Valley reversers per hour could be handled comfortably, but I'm not
sure about the four NLL services per hour - in theory it's possible,
but fairly tight.


The NLL service is actually meant to be increasing to 6tph by 2012, so
there will be somewhat a greater problem.

There's no capacity to send NLL trains beyond Stratford up the Lea
Valley line - too many Stansted Expresses wandering around to allow
them to reverse at, for example, Tottenham Hale.

I suspect that some deal to reinstate Hall Farm Curve will come as part
of the Olympic package, reopening Lea Bridge station and possibly with
a new station near the stadium site. Waltham Forest Council is
certainly keen on it, and it would make sense for the post-Olympic
regeneration to open this route up again.



--
Dave Arquati
Imperial College, SW7
www.alwaystouchout.com - Transport projects in London
  #3   Report Post  
Old October 9th 05, 07:43 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2005
Posts: 32
Default North Woolwich branch to close




On 9/10/05 1:27 am, in article , "Dave Arquati"
wrote:

The NLL service is actually meant to be increasing to 6tph by 2012, so
there will be somewhat a greater problem.


And to think that it almost closed (to passengers) not so very long ago.
Even at the time of the Broad Street closure it was still very much a
backwater of the system.

Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Stratford to North Woolwich Paul Scott London Transport 20 October 27th 06 02:39 PM
Steam between North Woolwich and Custom House... Mizter T London Transport 6 August 12th 06 07:55 PM
Steam between North Woolwich and Custom House... Al Holmes London Transport 0 August 11th 06 12:02 PM
Bus services in North Woolwich TheOneKEA London Transport 0 March 26th 06 06:03 PM
Canning Town - North Woolwich ONscotland London Transport 10 May 25th 05 03:55 PM


All times are GMT. The time now is 04:54 AM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017