Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
The Central London Railway began with Camel Backed Electric locomotives
hauling unpowered carriages. In order to improve efficiency distinct humps (mini summits) were built into the track profile at stations from Notting Hill to Liverpool Street - incoming trains were slowed by the rising gradient whilst outbound trains were hastened on their way by the falling out bound gradient. The heavy unsprung locomotives were soon replaced by multiple units with intermediate powered bogies. Does anybody know if humps are still built into station tracks on new tube lines. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Tube Lines construction at Stratford | London Transport | |||
Live lines on tube track? | London Transport | |||
More Tube lines now have live ETA boards | London Transport | |||
Street Map showing tube lines? | London Transport | |||
tube lines south of the river | London Transport |