Thameslink 2011
Interesting bit in Modern Railways regarding (probable) implementation
of 'Thameslink', with a halfway house to enable 12 car 16tph service. GN connection, major London Bridge changes to follow, after Olympics. Jim Chisholm |
Thameslink 2011
On Fri, 26 Jan 2007 17:44:50 +0000, J. Chisholm wrote:
Interesting bit in Modern Railways regarding (probable) implementation of 'Thameslink', with a halfway house to enable 12 car 16tph service. GN connection, major London Bridge changes to follow, after Olympics. How will they manage 16tph without the changes at London Bridge? |
Thameslink 2011
asdf wrote:
How will they manage 16tph without the changes at London Bridge? Few FCC services currently call at London Bridge during the peak hour - when the works at Farringdon and Blackfriars are combined with Borough Viaduct in Phase 1 (and I think the doubling of the single line between Blackfriars and LB), 16tph may become possible. |
All times are GMT. The time now is 02:23 AM. |
Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2006 LondonBanter.co.uk