London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #40   Report Post  
Old August 20th 03, 12:25 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Aug 2003
Posts: 10
Default Shielding 750 volt 3rd rail ?

"Cast_Iron" wrote in message
...
: Steve Fitzgerald wrote:
: In message , Arthur Figgis
: ] writes
: FWIW, you don't have to have overhead lines for electric
: trams - London had its conduit, and various places have
: had stud contact, including parts of the brand new tramway
: in Bordeaux.
:
: In fairness though, The Bordeaux system isn't open yet and
: the stud contact hasn't been proved to work successfully.
:
: But it has been used on previous systems I seem to recall (just don't ask
me
: when and where at the mo).
:
:
Marklin?

DW






 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Another professional fare dodger (and 3rd rail in Oxon ?) e27002 aurora London Transport 11 October 3rd 15 07:18 AM
Infraco's criticised again in 3rd annual PPP report Mizter T London Transport 12 August 2nd 06 09:10 PM


All times are GMT. The time now is 10:02 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017