Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
|
#1
![]() |
|||
|
|||
![]()
Mr Thant wrote:
TfL have announced a follow on order for Electrostars, mainly for 4th cars for their North London Railway fleet: http://www.tfl.gov.uk/corporate/medi...ntre/5432.aspx I could never understand why they didn't order four-car units for the North London line from the outset. You only have to look at the loadings on the 313s to see that additional capacity was desperately needed. |
#2
![]() |
|||
|
|||
![]() "Jack Taylor" wrote in message ... Mr Thant wrote: TfL have announced a follow on order for Electrostars, mainly for 4th cars for their North London Railway fleet: http://www.tfl.gov.uk/corporate/medi...ntre/5432.aspx I could never understand why they didn't order four-car units for the North London line from the outset. You only have to look at the loadings on the 313s to see that additional capacity was desperately needed. How much platform lengthening will be needed? In most cases it will merely involve reopening sections of platfrom which have been out of use for years, but lengthening Willesden Junction high level looks as though it will be expensive. Peter |
#3
![]() |
|||
|
|||
![]()
On Jul 4, 7:48 am, "Peter Masson" wrote:
but lengthening Willesden Junction high level looks as though it will be expensive. I'd say lengthening Willesden Juunction high level looks as though it will be horrendously expensive - possibly out of all proportion. One hopes that such an extensive piece of work willl be done to allow at least 8car (two units of of the proposed 4car Electrostars) if not 12car. -- Nick |
#4
![]() |
|||
|
|||
![]()
Peter Masson wrote:
How much platform lengthening will be needed? In most cases it will merely involve reopening sections of platfrom which have been out of use for years, but lengthening Willesden Junction high level looks as though it will be expensive. That's the main culprit. Quite a lot need little work other than stripping/resurfacing/drainage cleaning. WJ is the difficult one to squeeze another car length out of. Even SDO (to use the inner doors only of the end cars) wouldn't work, due to the siting of the signalling. |
#5
![]() |
|||
|
|||
![]()
Wouldn't it be relatively cheap to lengthen the platforms even
further? With the high level of overcrowding now and even more passengers using the route in the future, it seems like it will be needed. 8 coaches seems like a good number indeed. Longitudinal seating is simply needed on routes like this It might be slightly less comfortable, but that's not what peak train travellers will be thinking about. They're just happy to be able to get on. |
#6
![]() |
|||
|
|||
![]() "sweek" wrote in message oups.com... Wouldn't it be relatively cheap to lengthen the platforms even further? With the high level of overcrowding now and even more passengers using the route in the future, it seems like it will be needed. 8 coaches seems like a good number indeed. Getting a 4-coach platform length at Willesden High level will be expensive, but do-able. To get 8 coaches here, because of the junction with the City Goods Line, the only place is on a bridge over the WCML. To build it you'd probably need a lengthy closure of the WCML. Peter |
#7
![]() |
|||
|
|||
![]()
On Jul 4, 8:48 am, "Peter Masson" wrote:
probably need a lengthy closure of the WCML. Peter Merely continue as today then ![]() -- Nick |
#8
![]() |
|||
|
|||
![]()
D7666 wrote:
On Jul 4, 8:48 am, "Peter Masson" wrote: probably need a lengthy closure of the WCML. Merely continue as today then ![]() It's closed today? ;-) Better tell National Rail Enquiries. |
#9
![]() |
|||
|
|||
![]()
In message
"Peter Masson" wrote: "sweek" wrote in message oups.com... Wouldn't it be relatively cheap to lengthen the platforms even further? With the high level of overcrowding now and even more passengers using the route in the future, it seems like it will be needed. 8 coaches seems like a good number indeed. Getting a 4-coach platform length at Willesden High level will be expensive, but do-able. To get 8 coaches here, because of the junction with the City Goods Line, the only place is on a bridge over the WCML. To build it you'd probably need a lengthy closure of the WCML. Prefabricate the bridge off-site and swing it into position at three o'clock on a Sunday morning, minimum closure time needed. More of a problem is inserting it into the NNL without causing chaos the following Monday morning. -- Graeme Wall This address is not read, substitute trains for rail. Transport Miscellany at http://www.greywall.demon.co.uk/rail/index.html |
#10
![]() |
|||
|
|||
![]()
Graeme Wall wrote:
More of a problem is inserting it into the NNL without causing chaos the following Monday morning. Would anyone notice the difference? |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Last class 378 goes 5 car | London Transport | |||
Last class 378 goes 5 car | London Transport | |||
RAIB Investigation into an incident at Warren Street station, Victoria Line, London Underground, 11 July 2011 | London Transport | |||
Four-car North London Line | London Transport |