Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#3
![]() |
|||
|
|||
![]() "Jack Taylor" wrote in message ... Mr Thant wrote: TfL have announced a follow on order for Electrostars, mainly for 4th cars for their North London Railway fleet: http://www.tfl.gov.uk/corporate/medi...ntre/5432.aspx I could never understand why they didn't order four-car units for the North London line from the outset. You only have to look at the loadings on the 313s to see that additional capacity was desperately needed. How much platform lengthening will be needed? In most cases it will merely involve reopening sections of platfrom which have been out of use for years, but lengthening Willesden Junction high level looks as though it will be expensive. Peter |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Last class 378 goes 5 car | London Transport | |||
Last class 378 goes 5 car | London Transport | |||
RAIB Investigation into an incident at Warren Street station, Victoria Line, London Underground, 11 July 2011 | London Transport | |||
Four-car North London Line | London Transport |