Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#5
![]() |
|||
|
|||
![]()
Peter Masson wrote:
How much platform lengthening will be needed? In most cases it will merely involve reopening sections of platfrom which have been out of use for years, but lengthening Willesden Junction high level looks as though it will be expensive. That's the main culprit. Quite a lot need little work other than stripping/resurfacing/drainage cleaning. WJ is the difficult one to squeeze another car length out of. Even SDO (to use the inner doors only of the end cars) wouldn't work, due to the siting of the signalling. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Last class 378 goes 5 car | London Transport | |||
Last class 378 goes 5 car | London Transport | |||
RAIB Investigation into an incident at Warren Street station, Victoria Line, London Underground, 11 July 2011 | London Transport | |||
Four-car North London Line | London Transport |