London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #23   Report Post  
Old July 6th 07, 02:15 PM posted to uk.transport.london,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Jul 2007
Posts: 11
Default North London Line goes 4-car in early 2011

Trains would run from Queens Park through Kilburn High Road, South
Hampstead, and then divert through Primrose Hill tunnel to Camden Rd, and
thence to Stratford. There is a disused station at Primrose Hill that could
be opened too.


Would this mean that Euston loses the DC service, or will the
infrastructure be able to cope with the current EUS-WAT services, as
well as services through Primrose Hill etc.?

M

 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Last class 378 goes 5 car [email protected] London Transport 8 February 18th 16 10:08 AM
Last class 378 goes 5 car eastender[_5_] London Transport 2 February 16th 16 10:00 PM
RAIB Investigation into an incident at Warren Street station, Victoria Line, London Underground, 11 July 2011 Mizter T London Transport 3 August 5th 11 03:49 PM
Four-car North London Line Dr. Sunil London Transport 3 October 27th 10 11:26 AM


All times are GMT. The time now is 07:08 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017