London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #91   Report Post  
Old October 15th 07, 07:25 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Aug 2006
Posts: 6
Default Crossrail noes fail

I saw this image on the economist web site
http://www.economist.com/images/citi.../crossrail.jpg

Surely the crossrail trains aren't going to have just 2 doors per
carriage are they???


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Underground grammar fail Grebbsy McLaren London Transport 21 March 25th 16 06:27 AM
Boris: Crossrail not yet "signed, sealed and delivered" [was:Transport Secretary vows to finish Crossrail] E27002 London Transport 2 May 21st 10 06:13 PM
Optimum configuration of Crossrail (Was: Diesel Electric Trains on CrossRail) Aidan Stanger London Transport 3 August 12th 04 06:12 PM
Optimum configuration of Crossrail (Was: Diesel Electric Trains on CrossRail) [email protected] London Transport 3 August 9th 04 03:06 PM


All times are GMT. The time now is 07:49 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017