London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #51   Report Post  
Old October 11th 07, 11:11 AM posted to uk.transport.london,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Mar 2007
Posts: 973
Default Crossrail

On 10 Oct, 22:42, Roland Perry wrote:
In message , at 22:08:38 on Wed,
Does that include movements Heathrow to/from the west?


There's no indications of that on the sketch-maps they've produced so
far.


The diagrams are detailed enough, and there's no sign of it:
http://billdocuments.crossrail.co.uk...ter_09_pt4.pdf

Although, inspired by Beekant on the Brussels metro, where the
junction also faces the wrong way and trains reverse in service,
there's always reversing at H&H, which I think the Crossrail
infrastructure will make slightly easier, if not eminently viable for
one or two trains an hour. So the biggest barrier will be
electrification.

U

--
http://londonconnections.blogspot.com/
A blog about transport projects in London


  #52   Report Post  
Old October 11th 07, 07:58 PM posted to uk.transport.london,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Feb 2007
Posts: 8
Default Crossrail

On 11 Oct, 12:11, Mr Thant
wrote:
On 10 Oct, 22:42, Roland Perry wrote:

In message , at 22:08:38 on Wed,
Does that include movements Heathrow to/from the west?


There's no indications of that on the sketch-maps they've produced so
far.


The diagrams are detailed enough, and there's no sign of it:http://billdocuments.crossrail.co.uk...1.Environmenta...

Although, inspired by Beekant on the Brussels metro, where the
junction also faces the wrong way and trains reverse in service,


Beekkant? http://tinyurl.com/2aqy55

There's a not-very-clear animation of Beekkant's quirks he
http://nl.wikipedia.org/wiki/Afbeeld...t-Beekkant.gif

  #53   Report Post  
Old October 12th 07, 12:55 AM posted to uk.transport.london,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 2,577
Default Crossrail

bobrayner wrote:
On 11 Oct, 12:11, Mr Thant
wrote:
On 10 Oct, 22:42, Roland Perry wrote:

In message , at 22:08:38 on
Wed,
Does that include movements Heathrow to/from the west?


There's no indications of that on the sketch-maps they've produced
so far.


The diagrams are detailed enough, and there's no sign of
it:http://billdocuments.crossrail.co.uk...1.Environmenta...

Although, inspired by Beekant on the Brussels metro, where the
junction also faces the wrong way and trains reverse in service,


Beekkant? http://tinyurl.com/2aqy55

There's a not-very-clear animation of Beekkant's quirks he
http://nl.wikipedia.org/wiki/Afbeeld...t-Beekkant.gif


Is that correct? It suggests that the line through Osse has left-hand
running but the lines through Etan and West have right hand running. There
also seems to be no way of running trains between West and Osse without
ending up on the wrong track (I know they don't normally run that way, but
it's surprising the track layout would force them onto the wrong track).


  #54   Report Post  
Old October 12th 07, 07:37 AM posted to uk.transport.london,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Mar 2007
Posts: 973
Default Crossrail

On 12 Oct, 01:55, "John Rowland"
wrote:
Is that correct? It suggests that the line through Osse has left-hand
running but the lines through Etan and West have right hand running. There
also seems to be no way of running trains between West and Osse without
ending up on the wrong track (I know they don't normally run that way, but
it's surprising the track layout would force them onto the wrong track).


Yes, I've been on the line that reverses and switches sides, and was
quite surprised. As far as I can tell the line from the east (from the
city centre) was built to interchange with the existing north-south
heavy rail route, which was later incorporated into the Metro, and
this was the easiest way to do it. They're changing the service
pattern in 2009 to remove the reversal and the left-hand running on
the north branch.

U

--
http://londonconnections.blogspot.com/
A blog about transport projects in London



Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Boris: Crossrail not yet "signed, sealed and delivered" [was:Transport Secretary vows to finish Crossrail] E27002 London Transport 2 May 21st 10 06:13 PM
Optimum configuration of Crossrail (Was: Diesel Electric Trains on CrossRail) Aidan Stanger London Transport 3 August 12th 04 06:12 PM
Optimum configuration of Crossrail (Was: Diesel Electric Trains on CrossRail) [email protected] London Transport 3 August 9th 04 03:06 PM


All times are GMT. The time now is 03:39 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017