London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Old April 9th 08, 10:48 AM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Mar 2008
Posts: 11
Default Thameslink NGEMU procurement - now in motion

http://tinyurl.com/5asy9b
http://tinyurl.com/5deoog

Now we are looking at 1,100 vehicles (equivalent to 275 EMUs in 4-car
formation), which according to the DfT is a net increase of 380
vehicles.

  #2   Report Post  
Old April 9th 08, 11:25 AM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Aug 2003
Posts: 10,125
Default Thameslink NGEMU procurement - now in motion

In message
, at
03:48:54 on Wed, 9 Apr 2008, remarked:
http://tinyurl.com/5asy9b
http://tinyurl.com/5deoog

Now we are looking at 1,100 vehicles


That's 200 more than last time Ruth Kelly announced it in July last
year:

http://www.gos.gov.uk/gose/news/news...rojectForRail/

(equivalent to 275 EMUs in 4-car formation), which according to the DfT
is a net increase of 380 vehicles.


An increase of 380 in the size of Thameslink's fleet. [1].

So is that 380 out of the "famous 1000 more", or are they 100 over their
budget already?

Nice to see this re-announced again, anyway (it confirms our
prejudices); I wonder how many more times the same thing will be
announced

[1] Is that 380 more than the original size, or 380 more than the size
of the fleet after expansion with the 48 carriages announced almost
exactly a year ago?
--
Roland Perry
  #3   Report Post  
Old April 9th 08, 11:44 AM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jan 2006
Posts: 942
Default Thameslink NGEMU procurement - now in motion

On 9 Apr, 11:48, wrote:
http://tinyurl.com/5asy9bhttp://tinyurl.com/5deoog

Now we are looking at 1,100 vehicles (equivalent to 275 EMUs in 4-car
formation), which according to the DfT is a net increase of 380
vehicles.


Other interesting highlights:

* legal ownership will be structured in the conventional ROSCO way,
not as a PFI, but the tender will have to be jointly placed by the
manufacturer and the ROSCO working together

* the trains must weigh less than 32 tonnes per coach

* the bidder is required to consider the option of building a fleet
with two internal fit-outs (outer-suburban and metro. Wonder how long
that split would last in practice?)

* 45 second dwell times required

* the trains are required to deliver a 20 minute journey from Kentish
Town to London Bridge. Nitro!

* wifi and power sockets throughout

* a bit of ambiguity on bogs: all train designs must be "capable of
carrying" controlled emission toilets...

* ETMS2 required from the start

--
John Band
john at johnband dot org
www.johnband.org
  #4   Report Post  
Old April 9th 08, 12:10 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Nov 2004
Posts: 2,029
Default Thameslink NGEMU procurement - now in motion


"Roland Perry" wrote in message
...
In message
, at
03:48:54 on Wed, 9 Apr 2008, remarked:
http://tinyurl.com/5asy9b
http://tinyurl.com/5deoog

Now we are looking at 1,100 vehicles


That's 200 more than last time Ruth Kelly announced it in July last year:

http://www.gos.gov.uk/gose/news/news...rojectForRail/

(equivalent to 275 EMUs in 4-car formation), which according to the DfT is
a net increase of 380 vehicles.


An increase of 380 in the size of Thameslink's fleet. [1].

So is that 380 out of the "famous 1000 more", or are they 100 over their
budget already?

Nice to see this re-announced again, anyway (it confirms our prejudices);
I wonder how many more times the same thing will be announced

[1] Is that 380 more than the original size, or 380 more than the size of
the fleet after expansion with the 48 carriages announced almost exactly a
year ago?



A few more confusing numbers - I'd recommend waiting until Roger Ford gets
the real inside info and explains the figures!

Remember the latest Rolling Stock Plan (RSP) had a number (256) of EMUs for
FCC, rather than just Thameslink, in context this included the GN side as
well. However, I reckon these 'Thameslink 1100' are in addition to the 1300
in the RSP.

What clouds the issue further is the '48' and more recent '44' 377 vehicles
going to Thameslink for KO0, by all accounts they only stay until the new
units with their amazing acceleration and short dwell times arrive in time
for the 24 tph through the core route. Clearly 377s won't be able to keep
up!

Also - one other odd aspect - the Ruth Kelly sponsored press release states
1100 - but another document on the DfT site:

http://www.dft.gov.uk/pgr/rail/pi/th...ndoverview.pdf

says 'between 900 and 1300'. Don't they really know what they want?

In the same paragraph they say that configurations other than 20m cars are
welcomed - presumably any longer and the tunnels would have to be
straightened?

Paul



  #5   Report Post  
Old April 9th 08, 12:14 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 529
Default Thameslink NGEMU procurement - now in motion

On Apr 9, 1:10*pm, "Paul Scott"
wrote:


What clouds the issue further


So many clouds I have given up trying to track all this.

--
Nick




  #6   Report Post  
Old April 9th 08, 12:17 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 529
Default Thameslink NGEMU procurement - now in motion

On Apr 9, 1:10*pm, "Paul Scott"
wrote:

Clearly 377s won't be able to keep
up!



Dunno about that bit - a 375/377 is the same thing as a 376 except the
latter has more motors and - on DC at least - if comparing trains of
the same length - a higher current draw.

Mix and match 377 could be on the cards ... ... ... I'm saying no
more ) ... its this is one of the reason I have given up counting
cars and units.


--
Nick

  #7   Report Post  
Old April 9th 08, 12:20 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Nov 2004
Posts: 2,029
Default Thameslink NGEMU procurement - now in motion


"D7666" wrote in message
...
On Apr 9, 1:10 pm, "Paul Scott"
wrote:

What clouds the issue further


So many clouds I have given up trying to track all this.


Perhaps Roland should too - we can collectively pay the Rail Press to do it
for us!

But make sure to pick the right magazine - I see Railway Magazine itself had
a 'bollock-o-gram' from Tom Harris MP after they ran a highly pessimistic
piece, suggesting that the majority of the Rolling Stock plan was simply a
reshuffle of existing stock between TOCs...

LOL

Paul


  #8   Report Post  
Old April 9th 08, 01:57 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Dec 2007
Posts: 44
Default Thameslink NGEMU procurement - now in motion

On Apr 9, 11:48*am, wrote:
http://tinyurl.com/5asy9b
http://tinyurl.com/5deoog


I love the fact that at the end of a highly detailed, demanding
technical specification for a train that is meant to be suitable for
metro-style ATO as well as Kings Lynn to Eastbourne runs, there is the
following:

"Maintenance downtimes must be significantly reduced from the current
increasing trend that has arisen due to unnecessary sophistication".
  #9   Report Post  
Old April 9th 08, 02:01 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Aug 2003
Posts: 10,125
Default Thameslink NGEMU procurement - now in motion

In message , at 13:20:24 on
Wed, 9 Apr 2008, Paul Scott remarked:
What clouds the issue further


So many clouds I have given up trying to track all this.


Perhaps Roland should too - we can collectively pay the Rail Press to do it
for us!


I have given up (apart from to odd heckle from the sidelines like today)
tracking the numbers. Especially when people say this 1100 might be on
top of an earlier 1300, and I was only trying to track a different 1000.

On the other hand I may still try to track the announcements, and in the
longer term whether or not anything like the promises were delivered.
--
Roland Perry
  #10   Report Post  
Old April 9th 08, 02:22 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 529
Default Thameslink NGEMU procurement - now in motion

On Apr 9, 2:57*pm, EE507 wrote:


"Maintenance downtimes must be significantly reduced from the current
increasing trend that has arisen due to unnecessary sophistication".


Sounds like Henry Law could have written that !!!

--
Nick


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Exciting news on Thameslink 2000 (now "Thameslink Project") [email protected] London Transport 5 May 5th 06 07:45 PM
Concorde! on BBC2 now John Rowland London Transport 37 October 24th 03 07:25 PM
Help!!!! What happens now! Buying ticket from ticket tout Mike Harrison London Transport 14 October 24th 03 12:00 PM
Help!!!! What happens now! Buying ticket from ticket tout Paul Weaver London Transport 3 October 22nd 03 01:04 PM
East London Extension now has its own website dan London Transport 8 July 28th 03 11:20 AM


All times are GMT. The time now is 08:04 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017