Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#17
![]() |
|||
|
|||
![]()
robsignals said:
...I guess those engineers assumed they had been handed over correctly installed equipment and never thought to check the relay rating, pity they aren't brightly colour coded. Simulating real life faults is simply not possible or wise. Faults don't seem to be the issue. If the line went into overload protection at a fraction of what it should have done, a simple test of the line during commissioning (at 50% of rating) would have shown this. -- ============================================= Chris Game chrisgame@!yahoo!dotcodotuk ============================================= |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Highway or the Myway? A new Code for light relief | London Transport | |||
There are more information there | London Transport | |||
OT; Sewer Gas powered Gas light! | London Transport | |||
LURS meeting tonight: Docklands Light Railway Capacity Enhancement | London Transport | |||
London Buses - they got a special on light bulbs or something? | London Transport |