On 10 Sep 2003 15:31:14 -0700, robsignals wrote:
Wanderer wrote in message . .. snip On any interconnected system, the National Grid being a prime example, events are by definition related. Bad choice of words on your part, I think.How can a lightning strike in the west country and a 3rd party cable damage that happened to occur at more or less the same time in the west midland be related? No, that may never have happened, but I give it as an example of the flaw in your argument. This incident was caused by a classic very simple installation 'cock-up' made 2 years ago and not discovered or exposed since; system design, configuration and incident response were correct and supplies would have been securely maintained otherwise. Not true. Somewhere between design, configuration and commisioning a current multiplier was wrongly set, and was not picked up by testing procedures that should have picked it up. snipped the actual details, read with interest, but there seem to be some notable gaps that raise even more questions [1] Yes. Knowing the very strict and thorough commisioning and testing procedures that once were enforced, one is left wondering whether corners have been cut since privatisation. They were carried out but I guess those engineers assumed they had been handed over correctly installed equipment and never thought to check the relay rating, pity they aren't brightly colour coded. Simulating real life faults is simply not possible or wise. Paragraph 177 in the report is quite explicit about the procedures used to commission the protection. I would not fault them as written. Certainly the responsibility for returning a circuit to commision in good and proper order rests *exclusively* with the guys carrying out the work. Reading the full report my impression is of a well run and financed operation not obviously damaged by privatisation with London area investment running at £50m pa. Ironically the duplicate circuit, Wimbledon - New Cross No.1, is out from 1/7 to 28/9 for upgrade and refurb. Lessons have been, painfully, learnt and the relay error is not likely to happen again. All 45,000 are being checked (none found after 9,000). I would say the system is now secure I don't share your confidence. The report paints a picture of a calm and ordered working environment that almost certainly did exist two or three decades ago. I suspect those working for NGT might have some difficulty in recognising this environment today. building extra lines would be very expensive. The LT loss of supply is rather laid on EDF, the London distribution operator, who chose to operate their Wimbledon 132kV Substation in a way that resulted in LT and others losing supply when the Grid was able to maintain the full load without interuption, and should have reconnected LT in a couple of mins at most. I get the impression there was only one engineer in their Control who didn't know what hit him... Unlikely if they operate a centralised control system. But..... [1] The gaps:- It would have been nice to see an actual schematic of the network at Hurst s/s. They have three supergrid t/frs on site. I'm guessing that each would almost certainly be independently controlled, and consequently capable of isolation, by circuit breakers on the hv and lv sides of the t/fr. Buchholz alarms are usually t/fr specific in the control room, so why did the NG control engineer apparently disconect the incoming circuit and not isolate the tranformer indicating the alarm? If this had happened the overload situation would not have occured. It would also be interesting to compare areas of responsibility and manning levels for this part of their network now and say 25 years ago. What level of authority and/or delegation of that authority holds today compared to 25 years ago? |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Highway or the Myway? A new Code for light relief | London Transport | |||
There are more information there | London Transport | |||
OT; Sewer Gas powered Gas light! | London Transport | |||
LURS meeting tonight: Docklands Light Railway Capacity Enhancement | London Transport | |||
London Buses - they got a special on light bulbs or something? | London Transport |