London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #15   Report Post  
Old December 3rd 08, 09:39 AM posted to uk.railway,uk.transport.london,misc.transport.urban-transit
external usenet poster
 
First recorded activity at LondonBanter: Nov 2004
Posts: 49
Default Crossrail NOT making connections


"1506" wrote in message
...

Yes! In this instance the cost of conversion of the Hammersmith
branch would be a very small part of the overall cost of Crossrail.


The 'cost' needs to include the disruption to current users of services on
the branch while the conversion is being done. This could be substantial.

D A Stocks



 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Boris: Crossrail not yet "signed, sealed and delivered" [was:Transport Secretary vows to finish Crossrail] E27002 London Transport 2 May 21st 10 06:13 PM
Crossrail NOT making connections 1506 London Transport 0 November 26th 08 03:43 PM
Crossrail NOT making connections 1506 London Transport 0 November 26th 08 03:40 PM
Crossrail NOT making connections 1506 London Transport 0 November 26th 08 03:39 PM
It's not big, it's not clever - "Source who works for TfL" picks onpoor gullible journalist Mwmbwls London Transport 2 December 13th 07 10:36 AM


All times are GMT. The time now is 06:04 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017