ELL works trip
I'm going on a trip with work to cover the ELL worksite next week,
alongside various railway and civils hacks, visiting Shoreditch High Street, Dalston Junction, Thames Tunnel and NXG depot. Anyone got any qns/issues/areas that they've been wondering about, that I'd be an idiot to miss out on, etc? -- John Band john at johnband dot org www.johnband.org |
ELL works trip
On May 22, 3:32*pm, John B wrote: I'm going on a trip with work to cover the ELL worksite next week, alongside various railway and civils hacks, visiting Shoreditch High Street, Dalston Junction, Thames Tunnel and NXG depot. Anyone got any qns/issues/areas that they've been wondering about, that I'd be an idiot to miss out on, etc? Blimey, er, lots probably, need to have a bit of a think about it. Are you prepared to be inundated with questions from utlers?! I'm guessing that as is this is more infrastructure related there's not an awful lot of point asking questions about stuff like Shoreditch High Street being moved into zone 1 and also the dropping of the Victoria to Bellingham service (a quasi-replacement for the SLL) as you'll just get the party line parroted back at you. A few off the top of my head - I dare say there are already answers to many of these out there, but I'm not quite as good a document rummager as Mr Thant, John Bull, Mwmbwls et al. * Are things likely to be ready for a December '09 start? (Though of course they're not going to say "yes" as such!) * When are ELLX phase 2b works getting under way, what's the timetable etc? * How bleak is the interior of SHS station, and how are they planning on making it pleasant etc? And what's the latest with regards to surrounding developments there? * How many trains can NXG depot hold - and is the plan to move heavy maintenance there from Willesden depot? * What's going to happen to the old LU ELL New Cross depot? Any thoughts of berthing trains there? * A quasi-legal one - we know that the core of the ELL route will be owned by TfL, but does this fact of ownership mean in and of itself that it won't be subject to (economic) regulation from the ORR? (Of course it'll be subject to ORR/HMRI safety regulation and inspection.) That's a rather academic question, as the profile of the line means running freight or other trains over it is highly unlikely - but the uk.railway crowd will inevitably jump on this hypothetical possibility (indeed some already have) with regards to new longer distance through services, charter trains and freight. * I said I wasn't going to ask about SHS being moved into z1, but I've changed my mind. What thoughts are there on how this changes/disrupts/ destroys the business model for the line? Also, when SHS was still in zone 2, were there worries about overcrowding? * As a follow on thought to the overcrowding issue, could the line take 6-car trains, including somehow getting over the obstacle of short platforms at Canada Water? * How much bad blood was created between TfL and Network Rail as a result of the GE19 bridge collapse? (Or was Network Rail merely taking full advantage of having someone else to blame for once?!) * At Dalston Jn, can you still see the alignment of the north-eastern spur from the station site? And have they made allowances for its potential future use, however unlikely that may now seem? (I know the alignment still exists and hasn't been built on, apart from being part of the car park at the Kingsland Shopping Centre.) * Did all the running water in the Thames Tunnel make you want to take a slash? |
ELL works trip
Well I'd like to know if they are taking St Mary's curve out ie the one near WHitechapel that gives access to the District Line. It was in for stock movements before but presumably will be redundant now. |
ELL works trip
On 22 May, 16:08, Mizter T wrote:
* How bleak is the interior of SHS station, and how are they planning on making it pleasant etc? And what's the latest with regards to surrounding developments there? I noticed yesterday the panels aren't light-tight at the joins, so there's a tiny amount of daylight, at least for now. * As a follow on thought to the overcrowding issue, could the line take 6-car trains, including somehow getting over the obstacle of short platforms at Canada Water? Very good bloody question. There seems to be no consistency to their choices of platform lengths (SHS is 8 car; DJ has 4 car bay platforms and 6 car through platforms, not sure about the other new stations). An explanation is in order. * At Dalston Jn, can you still see the alignment of the north-eastern spur from the station site? I can answer this one. They've safeguarded a route/tunnel within the structure but it's now only wide enough to take a single track. U |
ELL works trip
On May 22, 5:32*pm, "Paul Rigg" wrote: Well I'd like to know if they are taking St Mary's curve out ie the one near Whitechapel that gives access to the District Line. It was in for stock movements before but presumably will be redundant now.. I understand it's gone already - indeed, it went a while back, just after the ELL closed for the extension works. |
ELL works trip
On 22 May, 17:34, Mr Thant
wrote: On 22 May, 16:08, Mizter T wrote: * As a follow on thought to the overcrowding issue, could the line take 6-car trains, including somehow getting over the obstacle of short platforms at Canada Water? Very good bloody question. There seems to be no consistency to their choices of platform lengths (SHS is 8 car; DJ has 4 car bay platforms and 6 car through platforms, not sure about the other new stations). An explanation is in order. See, I'm aware of the reasoning behind the decision to run 4 car trains. I'm fine with those. What I doubt I'll ever understand is why new build stations aren't being built with the minimum lengths required for 8 car operation, if nothing else then at least as safeguarded spaces. That way, the funding required is a case of some cheap platform extensions, signalling changes, and a few big spends on the current crop of stations restricted to 4-car operation....as opposed to...say...rebuilding everything. Dalston Junction's having a tower block built over it, but they had free reign over the station design. Why on earth not build passive provision in rather than being forever locked into short formations? Would it have been so hard to have the active area of the through platforms and the bays line up and have both as 8 cars long? There's plenty of room for the pointwork south of the station. * At Dalston Jn, can you still see the alignment of the north-eastern spur from the station site? I can answer this one. They've safeguarded a route/tunnel within the structure but it's now only wide enough to take a single track. ....as above, the alignment is highly unlikely to ever be used, but it used to be double track (I think?)...and is it *really* that much harder to leave a slightly wider formation clear...really? |
ELL works trip
Paul Rigg wrote:
Well I'd like to know if they are taking St Mary's curve out ie the one near WHitechapel that gives access to the District Line. St. Mary's Curve is long gone. It was decommissioned in four stages after the last service train on 22nd December 2007. This concluded with a hoarding being erected in the tunnel approximately 50m East of the junction on the night of 12th January 2008, clear of the District Line tracks. Relevant Traffic Circulars are Issue 51 of 2007, 52/1 of 2007/8 and 2 of 2008 (still available on the LU Operational Standards site). Cheers, Barry |
ELL works trip
On 22 May, 15:32, John B wrote:
I'm going on a trip with work to cover the ELL worksite next week, alongside various railway and civils hacks, visiting Shoreditch High Street, Dalston Junction, Thames Tunnel and NXG depot. Anyone got any qns/issues/areas that they've been wondering about, that I'd be an idiot to miss out on, etc? -- John Band john at johnband dot orgwww.johnband.org 1. What are they doing about a second exit from Wapping? 2. Are they making Wapping fully accessible; if so, then how, given that wheelchairs would fall off the platforms, given the width? 3. Will Rotherhithe look any better? Or will it still resemble the lift lobby in a run down 70s council tower block? |
ELL works trip
"John B" wrote in message ... I'm going on a trip with work to cover the ELL worksite next week, alongside various railway and civils hacks, visiting Shoreditch High Street, Dalston Junction, Thames Tunnel and NXG depot. Anyone got any qns/issues/areas that they've been wondering about, that I'd be an idiot to miss out on, etc? Is the 378 fleet actually going to be divided into dual voltage and DC only versions? (noting recent thread referring to stabling ELL units at Orient Way etc)... Paul |
ELL works trip
|