London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #11   Report Post  
Old November 8th 09, 07:33 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 627
Default North London Line closures

In message , "
writes

I also see that the Journey Planner indicates that inf. about
services over the Christmas period (including Christmas Eve) will be
available mid-December. That seem to be rather a poor show for
people wanting to plan now (including for instance booking journeys
through London). Just out of interest, is it a matter of management
still being in negotiation with unions/staff?


What does happen with staff when a line is put out of service? What has
also happened with staff from the East London Line and what will happen
with them once the line goes back into service, which I understand to
be 23 May 2010.


In the case of the ELL, the LUL drivers were displaced to a 'depot of
their choice'. I gather many (most?) chose to transfer to Leytonstone
and have duly been trained there on the Central line. This has caused a
large over-compliment there and some are now transferring to Stratford
Market depot for the Jubilee.

Once the new ELL runs it will be operated by LOROL with their drivers.
--
Steve Fitzgerald has now left the building.
You will find him in London's Docklands, E16, UK
(please use the reply to address for email)

  #12   Report Post  
Old November 9th 09, 12:09 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2009
Posts: 1,484
Default North London Line closures

Steve Fitzgerald wrote:
In message , "
writes

I also see that the Journey Planner indicates that inf. about
services over the Christmas period (including Christmas Eve) will be
available mid-December. That seem to be rather a poor show for
people wanting to plan now (including for instance booking journeys
through London). Just out of interest, is it a matter of management
still being in negotiation with unions/staff?


What does happen with staff when a line is put out of service? What
has also happened with staff from the East London Line and what will
happen with them once the line goes back into service, which I
understand to be 23 May 2010.


In the case of the ELL, the LUL drivers were displaced to a 'depot of
their choice'. I gather many (most?) chose to transfer to Leytonstone
and have duly been trained there on the Central line. This has caused a
large over-compliment there and some are now transferring to Stratford
Market depot for the Jubilee.

Once the new ELL runs it will be operated by LOROL with their drivers.

I see.

What happens with drivers when a line is shut down for a day or two,
such as the Victoria Line?
  #13   Report Post  
Old November 9th 09, 08:18 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: May 2007
Posts: 78
Default North London Line closures

On Nov 9, 1:09 am, "
wrote:
I see.

What happens with drivers when a line is shut down for a day or two,
such as the Victoria Line?


They go to the depot and play cards for their shift.

[Non-driving work, training etc, is probably also done.]

--
Abi
  #14   Report Post  
Old November 9th 09, 04:35 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Nov 2009
Posts: 1
Default North London Line closures

The closurse dates for the North London Line between Gospel Oak and
Stratford are now approx. mid-February until end May 2010. These are still
subject to change. However the closure period will be something of the
order of 12 to 16 weeks. A revised service will run between Gospel Oak and
Richmond/Clapahm Junction. Upon reopening, the NLL will use the northern
pair of tracks (the No. 1 Lines) between Camden Road East Junction and
Dalston Kingsland, including a revised platform layout at Caledonian Road
and new platforms at Highbury and Canonbury. The old NLL platforms at
Highbury and Canonbury will be closed for refurbishment and conversion for
use by the East London Line when it is extended from Dalston Junction
sometime between November 2010 and February 2011.

url:http://myreader.co.uk/msg/142319975.aspx


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Victoria & Piccadilly Line Closures This Weekend martin London Transport 0 October 6th 10 12:09 PM
Victoria & Piccadilly Line Closures This Weekend [email protected] London Transport 0 October 6th 10 08:59 AM
Summer of Northern line early closures cancelled Mizter T London Transport 1 June 29th 10 07:50 PM
Another six months of closures on Jubilee line to finish botched upgrade - Evening Standard Bruce[_2_] London Transport 15 November 25th 09 09:37 PM
Victoria Line early closures martin London Transport 39 January 22nd 08 10:26 AM


All times are GMT. The time now is 02:51 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017