Default Eurostar to quit Waterloo

David Marsh wrote:
[Outlook Express bug: message invisible. See http://viewport.co.uk/outlook ]
begin Dave Arquati's quote in uk.railway
about: Eurostar to quit Waterloo


Just a general comment in this thread; everyone is assuming that people
will transfer from Waterloo to St Pancras, but there will also be a
direct transfer between Waterloo and Stratford, which only takes 23
minutes platform to platform, compared to the 16 minutes for Waterloo to
St Pancras. There will hopefully be a travelator at Stratford to
compensate for it being a longer interchange than St Pancras.



That's a good point (and a remarkably quick journey in comparison,
considering that it's going much further). Will every eurostar be stopping
at Stratford, though?


No, not all of them; I suspect stopping patterns will alternate somehow
between Stratford or Ebbsfleet.

If the Olympic bid is successful, no Eurostars would stop at Stratford
for the duration of the Olympics, to create capacity for the "Javelin"
St Pancras - Stratford - Ebbsfleet shuttle to run (with cross-platform
interchange to Eurostar at Ebbsfleet).

How infeasible (read: costly) would it be to build an underground
travelator link between Euston Station (with access from the mainline
and the Underground) to St Pancras International (also linking with
King's Cross and King's Cross / St Pancras Underground)?

It's only about 500 m on the surface, and given the nature of all the
existing gubbins underground, probably less than that in practice.


The existing gubbins underground is rather the problem. There's so much
down there, it would be difficult to find somewhere to put the tunnel


Oh, I know :-)


There's so much gubbins, they even ruled out surface works to run the
Cross River Transit along the Euston Road to reach St Pancras. Following
opposition from Somers Town residents, now it has to take a ridiculous
route via Mornington Crescent!

Would it be possible for the travelator to go at roughly the same depth,
but parallel to the Metropolitan line?


On the northern side of the Met, I think that would foul the new Western
ticket office at King's Cross. As for the southern side, I've really no
idea. The foundations of the buildings might prevent it being built at
the same level as the Metropolitan.

Oh, and there are other things like the Thameslink tunnel and the
various other old railway tunnels (which aren't very deep) like the
Hotel Curve and the Maiden Lane Curve.

(I'm presuming all the other 'deep tube' lines are indeed, somewhere
deeper at this point - it must be quite a job for someone just keeping
accurate tabs on what, exactly, is all down there, and where exactly
they all are!)


Some of them aren't that deep. Victoria is closest to the surface,
Piccadilly is just underneath, and Northern is just underneath that.
However, all of them are over to the eastern side of the overground
station and the tube ticket hall.

(unless you put it very deep, which just defeats the point if you spend
ages trekking down into the bowels of the earth and out again at the
other end).



Obviously you would have escalators rather than trekking (although I
agree it might be somewhat bizarre to go all the way down an escalator
only to have to pretty much immediately go up another one ;-)


For example, taking the tube from Marylebone to Baker Street and
changing to a subsurface line (takes longer than just walking to Baker
St!). Escalators aren't very quick unless you walk up and down them...

Maybe you could have a little funicular or rack-and-pinion railway
shuttle (flog it as a tourist attraction between train times ;-), but
this would start adding even more expensive to a possibly ridiculous
project and loses the continuous flow advantages of the
travelators/escalators :-)


Actually that sounds quite fun.

Alternatively, suspend a travelator above to Euston Road in a
transparent enclosed tube, and give it an interesting design. It would
be especially fun if it were some sort of spiral travelator that takes
you from ground level up to, say, the third storey and back down again
at the other end.

This would put Waterloo and Euston (and Victoria, come to that) within
easy reach of St Pancras, with only one Underground transfer required.


Er, Victoria already has a pretty decent link to St Pancras :-)


I know, I was just thinking in terms of decreasing the number of station
stops and in trying to reduce passenger number on the stretch of
Underground between Euston and St P. However, I suspect there wouldn't
be any time savings in getting off a stop earlier and getting the
travelator direct into the international station than just continuing on
the Victoria line to St P anyway..


Well I don't know; if the travelator took you from the Victoria line
platforms at Euston, and it were reasonably fast (like that "high speed"
one at some Paris station)...

Better yet: build Cross River Transit; surface light rail between
Waterloo and King's Cross, every 90 seconds in the peaks. No need to
journey to the centre of the earth, and you get a view.


That would be good. It would need to have considerable priority over
other road traffic (ie, considerable segregation) so that it wouldn't be
uncompetitively slow, though. I'm guessing the Kingsway subway features
somewhere in such plans?


The plan is to have a heavily-segregated bus and tram route along the
whole central corridor from Camden to Waterloo. Every junction would
have tram priority installed, except for the one at the Euston Road,
where the 90-second timing of the traffic lights is vital to keep
traffic on the Euston Road moving. That's the limiting factor to tram
frequency; in the peaks there would be 40tph, so departures from the
tramstops either side of the Euston Road would be managed to get them
across with the lights, and prevent bunching.

Kingsway subway does not actually feature; it's considered a bit too
restrictive for modern trams. Instead, trams would have their own lanes
on the surface, running contraflow southbound on the western side of
Aldwych.

(And while I'm in tunnel-digging mode, why not merge Embankment and
Charing Cross Northern/Bakerloo stations into one station (on each line)
with travelators to shrink the distance/time from the existing entrances,
to save the time of an extra station stop? Or would that require an
incredible amount of underground reconstruction work?)


Ouch. Charing Cross Northern and Bakerloo platforms are miles away from
Charing Cross SET as it is, without merging them.


I know, that's why I was suggesting travelators from the existing
entrances to a *new* combined station which would be pretty much
underneath Charing Cross station itself, so that the station properly
serves the mainline station but is *also* still accessible to the street
in the original locations. I know there are historical reasons, but it
just seems a little odd to have two stations (Embankment and Charing
Cross) in a relatively short distance. Some kind of unification, like
Bank-Monument, would seem to be more sensible. But it'd be extremely
expensive, for relatively little gain, so it wouldn't happen :-)


Oh, I see what you mean now. You'd make interchange between the deep
tube and subsurface lines worse though.

It would make more
sense to split them back into what they used to be before the Jubilee
Line arrived - Trafalgar Square (Bakerloo) and Strand (Northern). The
Bakerloo platforms are certainly more suited to Trafalgar Square than
Charing Cross. After all, Embankment used to be called Charing Cross...


Yeah, it's quite clear from the plans on John Rowland's site that if it
hadn't been for the Jubilee line, then they probably would still have
remained as very discrete separate stations..

But am I right in thinking that research has shown that people don't
"mind" so much the walking between parts of interchange stations?
That people regard themselves as "on the Underground" as soon as they've
passed the ticket barriers, and that a couple of minutes spent walking
(or travelating!) through the tunnels is better than the same couple of
minutes waiting impatiently on the platform for a train (ie, the feeling
that you're in control of your actions, or not) - and, in this day and
age, a useful bit of exercise, too!?


I haven't heard that research. I can understand the "on the Underground"
mentality though; that extends to finding your way to unfamiliar places
too. I met two Imperial students on the Circle line yesterday who were
on their way to High St Kensington... having walked from Imperial to
Gloucester Road and boarded there, as they didn't know the way to
Kensington High Street.

Still, I would do almost anything to avoid a change at Green Park.
(Except perhaps having to use the Circle line; then it's a case of
balancing the relative evils.)

--
Dave Arquati
Imperial College, SW7
www.alwaystouchout.com - Transport projects in London

  #252   Report Post  
Old December 2nd 04, 09:38 PM posted to uk.transport.london,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 1,429
Default Eurostar to quit Waterloo

David Marsh wrote:
[Outlook Express bug: message invisible. See
http://viewport.co.uk/outlook ]


If you want to campaign against Outlook Express, please don't do it
here. As far as I am concerned, your post was deliberately configured
to appear as off-topic spam to a sizable proportion of the people
reading these newsgroups.
--
Richard J.
(to e-mail me, swap uk and yon in address)

  #253   Report Post  
Old December 3rd 04, 06:50 AM posted to uk.transport.london,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 856
Default Eurostar to quit Waterloo

In article , Dave Arquati
writes
(I'm presuming all the other 'deep tube' lines are indeed, somewhere
deeper at this point - it must be quite a job for someone just keeping
accurate tabs on what, exactly, is all down there, and where exactly
they all are!)


Some of them aren't that deep. Victoria is closest to the surface,
Piccadilly is just underneath, and Northern is just underneath that.
However, all of them are over to the eastern side of the overground
station and the tube ticket hall.


At King's Cross, the depths of the platforms below the tube ticket hall
a
* Northern 22.86m
* Piccadilly 17.22m
* Victoria 11.67m
I would guess that the booking hall is another 5m or so below ground
level, but I don't have definitive figures.

At Euston, the southbound platform is 23.38m below the booking hall, and
the northbound 23.56m. That hall is deeper than the KXSP one, or at
least it feels that way.

For example, taking the tube from Marylebone to Baker Street and
changing to a subsurface line (takes longer than just walking to Baker
St!). Escalators aren't very quick unless you walk up and down them...


The normal speed is 369mm (vertical) per second. The Marylebone ones are
21.58m, making 58.5 seconds (plus a bit more for the level bits at each
end; call it a minute).

--
Clive D.W. Feather | Home:
Tel: +44 20 8495 6138 (work) | Web: http://www.davros.org
Fax: +44 870 051 9937 | Work:
Please reply to the Reply-To address, which is:
  #254   Report Post  
Old December 3rd 04, 07:53 AM posted to uk.transport.london,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 2,577
Default Eurostar to quit Waterloo

"Dave Arquati" wrote in message
...

If the Olympic bid is successful, no Eurostars would
stop at Stratford for the duration of the Olympics,
to create capacity for the "Javelin" St Pancras - Stratford
Ebbsfleet shuttle to run (with cross-platform interchange
to Eurostar at Ebbsfleet).


Cross-platform via passport check and sniffing dog.

How infeasible (read: costly) would it be to build
an underground travelator link between Euston
Station (with access from the mainline and the
Underground) to St Pancras International (also
linking with King's Cross and King's Cross / St
Pancras Underground)?


Would it be possible for the travelator to go at roughly
the same depth, but parallel to the Metropolitan line?


On the northern side of the Met, I think that would
foul the new Western ticket office at King's Cross.


Surely rather than "foul it", it would emerge into one side of it, which is
probably pretty much what you want.

Anyway, isn't there a never-used twin-track branch of the Thameslink tunnel
stretching to Euston along the north side of the Met? Although a bit was
destroyed by the widening of the Met in the 1930s and another bit destroyed
by the new ticket hall, isn't the rest of it just what is needed?

the Maiden Lane Curve.


Do you mean the York Road curve?

I agree it might be somewhat bizarre to go
all the way down an escalator only to have
to pretty much immediately go up another one ;-)


It beats walking, though.

--
John Rowland - Spamtrapped
Transport Plans for the London Area, updated 2001
http://www.geocities.com/Athens/Acro...69/tpftla.html
A man's vehicle is a symbol of his manhood.
That's why my vehicle's the Piccadilly Line -
It's the size of a county and it comes every two and a half minutes


  #255   Report Post  
Old December 3rd 04, 09:31 AM posted to uk.transport.london,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 1,158
Default Eurostar to quit Waterloo

Richard J. wrote:
David Marsh wrote:

[Outlook Express bug: message invisible. See
http://viewport.co.uk/outlook ]



If you want to campaign against Outlook Express, please don't do it
here. As far as I am concerned, your post was deliberately configured
to appear as off-topic spam to a sizable proportion of the people
reading these newsgroups.


Was it in reference to my post? Because I'm definitely not using Outlook
Express.

--
Dave Arquati
Imperial College, SW7
www.alwaystouchout.com - Transport projects in London


  #256   Report Post  
Old December 3rd 04, 09:35 AM posted to uk.transport.london,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 1,158
Default Eurostar to quit Waterloo

John Rowland wrote:
"Dave Arquati" wrote in message
...

If the Olympic bid is successful, no Eurostars would
stop at Stratford for the duration of the Olympics,
to create capacity for the "Javelin" St Pancras - Stratford
Ebbsfleet shuttle to run (with cross-platform interchange
to Eurostar at Ebbsfleet).


Cross-platform via passport check and sniffing dog.


Of course. (I was wondering how they would achieve that cross-platform
change; it's mentioned in the Olympic bid document.)

How infeasible (read: costly) would it be to build
an underground travelator link between Euston
Station (with access from the mainline and the
Underground) to St Pancras International (also
linking with King's Cross and King's Cross / St
Pancras Underground)?


Would it be possible for the travelator to go at roughly
the same depth, but parallel to the Metropolitan line?


On the northern side of the Met, I think that would
foul the new Western ticket office at King's Cross.


Surely rather than "foul it", it would emerge into one side of it, which is
probably pretty much what you want.

Anyway, isn't there a never-used twin-track branch of the Thameslink tunnel
stretching to Euston along the north side of the Met? Although a bit was
destroyed by the widening of the Met in the 1930s and another bit destroyed
by the new ticket hall, isn't the rest of it just what is needed?


I had no idea such a tunnel existed.

the Maiden Lane Curve.


Do you mean the York Road curve?


That too. Maiden Lane is the counterpart of the York Road one, but for
the other direction (Great Northern to westbound subsurface).

Actually none of those curves matter if the travelator link only extends
to the Western ticket office.

I agree it might be somewhat bizarre to go
all the way down an escalator only to have
to pretty much immediately go up another one ;-)


It beats walking, though.


Not if it's slower than walking! (Would you take the bus from Bond St to
Oxford Circus?)

--
Dave Arquati
Imperial College, SW7
www.alwaystouchout.com - Transport projects in London
  #257   Report Post  
Old December 3rd 04, 05:26 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 123
Default County of Southend-on-Sea etc.

"Tom Anderson" wrote in message
...
On Thu, 2 Dec 2004, Roland Perry wrote:

As catching an E* is clearly some kind of ceremony (involving officials,
handing over passports and tickets etc), can we draw a veil over the
earlier red herrings and go back to wondering things like "would a
resident of Thurrock really get a local train [1] all the way to
Stratford, rather than hopping across the river to Ebbsfleet"?


No.

The reason we can't is because it's obvious - it would be madness to take
the train if the car is faster.

The argument we were having before all this county business blew up was
really a failure to agree on what 'Essex' means: you think of it as the
bit where you live (i'm guessing), and i think of it as the bit where i
grew up - let's call them Inner and Outer Essex. People in Inner Essex,
like this resident of Thurrock you mention, will probably drive to
Ebbsfleet, or even to Ashford, or, if they need to use public transport,
take some sort of coach there. People in Outer Essex are more likely to
come to London, and either change at Stratford, or, if their train doesn't
stop there, go from Liverpool Street to either King's Cross or Stratford.


Except that people in the innermost part of inner Essex - the Greater
London
part - would probably also find Stratford more convenient. I grew up
in
Romford, and I'm sure that it'd be easier via Stratford (one train, 20
minutes) than Ebbsfleet (at least a 40 minute car journey).

What used to be Essex kind of splits into three now I think: the home
counties bit in the northern half; the Essex girl joke bit in the
South; and the greater East End bit inside the M25, which is like a
Londonized version of the southern half of the county.



Jonn
  #258   Report Post  
Old December 3rd 04, 05:51 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Aug 2003
Posts: 10,125
Default County of Southend-on-Sea etc.

In message , at
10:26:26 on Fri, 3 Dec 2004, Jonn Elledge
remarked:
Except that people in the innermost part of inner Essex - the Greater
London part - would probably also find Stratford more convenient. I
grew up in Romford, and I'm sure that it'd be easier via Stratford (one
train, 20 minutes) than Ebbsfleet (at least a 40 minute car journey).


Yes, some people are lucky to live near convenient public transport
links. A lot of people in Essex don't - hence the proliferation of cars.
--
Roland Perry
  #259   Report Post  
Old December 3rd 04, 09:51 PM posted to uk.transport.london,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 856
Default Eurostar to quit Waterloo

In article , John Rowland
writes
Anyway, isn't there a never-used twin-track branch of the Thameslink tunnel
stretching to Euston along the north side of the Met?


No. There was a single-track tunnel from St.Pancras to meet the (now)
Thameslink tunnel.

Although a bit was
destroyed by the widening of the Met in the 1930s


For "a bit" read "just about all".

the Maiden Lane Curve.

Do you mean the York Road curve?


No, he means the tunnel that links *west* to *north*, branching off the
York Road curve about half way down.

http://www.davros.org/rail/culg/hammersmith.html, as I've already
said, has diagrams.

--
Clive D.W. Feather | Home:
Tel: +44 20 8495 6138 (work) | Web: http://www.davros.org
Fax: +44 870 051 9937 | Work:
Please reply to the Reply-To address, which is:
  #260   Report Post  
Old December 3rd 04, 10:36 PM posted to uk.transport.london,uk.railway,uk.transport
external usenet poster
 
First recorded activity at LondonBanter: Aug 2004
Posts: 36
Default Eurostar to quit Waterloo

Roland Perry wrote in message o.uk...
In message , at 12:50:19 on
Wed, 24 Nov 2004, TP remarked:
If Waterloo International remained open, St Pancras International
would be little more then a hideously expensive flop.


With half the number of trains to reach critical mass, that might well
be the case. Meanwhile, the journey time from Waterloo will be
unattractive also. What's wrong with promoting the Waterloo East to
Ashford services as a compromise?


I rather expect fewer Waterloo - Ashord trains in future, as many
Ashford and beyond commuters will choose to take the CTRL commuter
services.


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Waterloo - KX post Eurostar move Paul Corfield London Transport 4 October 9th 07 09:38 PM
Eurostar to quit Waterloo Colin Rosenstiel London Transport 0 December 5th 04 04:50 PM
Check-in for Eurostar at Waterloo Sam Holloway London Transport 9 May 19th 04 07:16 AM
Eurostar @ Waterloo Wanderingjew698 London Transport 14 April 27th 04 05:39 AM
New Eurostar line from Waterloo Roger the cabin boy London Transport 24 September 25th 03 10:44 PM


All times are GMT. The time now is 06:43 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017