Thread: Long DLR Train
View Single Post
  #34   Report Post  
Old February 3rd 10, 06:26 PM posted to uk.transport.london
[email protected] hounslow3@yahoo.co.uk is offline
external usenet poster
 
First recorded activity at LondonBanter: Jul 2009
Posts: 1,484
Default Long DLR Train

On 03.02.10 16:32, Clive wrote:
In message , Recliner
writes
does the DLR use lightweight
rails?

I would have thought so, I must be cheaper to use 70 lbs a yard steel
than 120 lbs a yard steel in base product alone before any pre-forming
takes place.

What do you mean by base product?