London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #17   Report Post  
Old February 3rd 10, 06:26 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2009
Posts: 1,484
Default Long DLR Train

On 03.02.10 16:32, Clive wrote:
In message , Recliner
writes
does the DLR use lightweight
rails?

I would have thought so, I must be cheaper to use 70 lbs a yard steel
than 120 lbs a yard steel in base product alone before any pre-forming
takes place.

What do you mean by base product?
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Long DLR Trains to Stratford MIG London Transport 10 December 13th 10 06:50 PM
Long DLR Train Part 2 MIG London Transport 1 August 7th 10 12:42 PM
Subway (New York) vs Underground (London) [Quite long] Gareth Davis London Transport 70 April 11th 04 07:39 PM
"How long are the delays?" Kippo Oppik London Transport 3 February 5th 04 10:17 AM
Long-lasting ticket to Brighton Alp140671 London Transport 2 July 28th 03 05:19 PM


All times are GMT. The time now is 06:55 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017