Long DLR Train
In message , "
writes
I would have thought so, I must be cheaper to use 70 lbs a yard steel
than 120 lbs a yard steel in base product alone before any pre-forming
takes place.
What do you mean by base product?
Steel bar to be converted into rails.
--
Clive
|