Home |
Search |
Today's Posts |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#18
|
|||
|
|||
Long DLR Train
In message , "
writes I would have thought so, I must be cheaper to use 70 lbs a yard steel than 120 lbs a yard steel in base product alone before any pre-forming takes place. What do you mean by base product? Steel bar to be converted into rails. -- Clive |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
Long DLR Trains to Stratford | London Transport | |||
Long DLR Train Part 2 | London Transport | |||
Subway (New York) vs Underground (London) [Quite long] | London Transport | |||
"How long are the delays?" | London Transport | |||
Long-lasting ticket to Brighton | London Transport |