View Single Post
  #3   Report Post  
Old October 18th 11, 09:42 PM posted to uk.transport.london
zen83237 zen83237 is offline
external usenet poster
 
First recorded activity at LondonBanter: May 2007
Posts: 139
Default Overrun of engineering work on the Wimbledon Branch


"Richard J." wrote in message
...
Zen83237 wrote on 18 October 2011 18:56:07 ...
I understand that there a 12 hour overrun on engineering work on the
Wimbledon branch recently. Can any body tell me what happened?


I can't explain what happened, but I noticed a poster at Turnham Green on
the evening of Tuesday 11 October containing an apology by Balfour Beatty
for disruption on the Wimbledon branch that morning. An engineering
overrun was my first thought. But a 12-hour overrun seems unlikely, as
that would imply services not restored until around 17:00, which was
roughly when I saw the poster. But it must have been bad to have the
poster printed. The Evening Standard that evening reported District Line
disruption but gave no details.
--
Richard J.
(to email me, swap 'uk' and 'yon' in address)

12 hours seems a hell or an overrun but I was told it was 12 hours and
there were a lot or arses kicked at LU and BB.