Default How Long to Install a Lift?

Latest generation Kone lifts have a good reputation for reliability.


The "works" is all in the shaft, or "hoistway" to use the technical term.

This brochure from Kone US gives more details, although in a building context

http://cdn.kone.com/www.kone.us/Imag...evator.pdf?v=2

Ken


On 2015-03-23 13:49:35 +0000, Paul Corfield said:

On Mon, 23 Mar 2015 10:14:14 +0000, John Ray wrote:

There is no step-free access to the Jubilee Line at London Bridge from
24 February to mid-August while a lift is being replaced. That's about
6 months. Given that the lift shaft is already in place, could the job
not be done much more quickly?


The design of the replacement lift is very different from the one it
replaces AIUI. I believe the new lifts are machine room less lifts.
There was a recent TfL funding paper about this.

here is an excerpt from the paper about scope. There was no more
detail than this.

• Replacement of nine hydraulic lifts with KONE ‘machine-roomless’
traction units with gearless drive in line with the Lifts and
Escalators Strategy.
• Project management of Capex interventions for the 20 year
contract life until 2034.
• Enabling works including modifications to lift shafts and
improvements to ‘ancillary’ services.