View Single Post
  #9   Report Post  
Old December 29th 15, 10:18 AM posted to uk.transport.london,misc.transport.urban-transit,uk.railway
e27002 aurora e27002 aurora is offline
external usenet poster
 
First recorded activity at LondonBanter: Nov 2014
Posts: 284
Default By Londons Northern Line to Battersea

On Tue, 29 Dec 2015 03:00:52 +0000, Basil Jet
wrote:

On 2015\12\28 22:51, Recliner wrote:
wrote:
On Thu, 24 Dec 2015 14:25:15 +0000
Basil Jet wrote:
I notice that "Nine Elms" roundels have gone up all over the hoarding
surrounding the former Sainsburys opposite Wilcox Road.

Boris has also ceremonially started a conveyor belt from the Battersea
station site to the Thames. https://www.youtube.com/watch?v=gcjSnzw38iI

Maybe they should have just built a two way conveyor from Battersea to
Vauxhall and then we wouldn't need the railway ;-)

I wonder if when that extension is built and the line is operationally split
in 2 whether one half of the line will be given a new name or whether it'll
still all be known as the northern line?


The extension is certainly being built and will open in 2020, but the line
won't be split into two for some years (if at all). The split requires the
rebuilding of Camden Town station.


So Morden will just lose, what, a third of its peak service?


One presumes the trains that currently terminate at Kennington will
proceed onto the new branch.