Home |
Search |
Today's Posts |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#9
|
|||
|
|||
By Londons Northern Line to Battersea
On Tue, 29 Dec 2015 03:00:52 +0000, Basil Jet
wrote: On 2015\12\28 22:51, Recliner wrote: wrote: On Thu, 24 Dec 2015 14:25:15 +0000 Basil Jet wrote: I notice that "Nine Elms" roundels have gone up all over the hoarding surrounding the former Sainsburys opposite Wilcox Road. Boris has also ceremonially started a conveyor belt from the Battersea station site to the Thames. https://www.youtube.com/watch?v=gcjSnzw38iI Maybe they should have just built a two way conveyor from Battersea to Vauxhall and then we wouldn't need the railway ;-) I wonder if when that extension is built and the line is operationally split in 2 whether one half of the line will be given a new name or whether it'll still all be known as the northern line? The extension is certainly being built and will open in 2020, but the line won't be split into two for some years (if at all). The split requires the rebuilding of Camden Town station. So Morden will just lose, what, a third of its peak service? One presumes the trains that currently terminate at Kennington will proceed onto the new branch. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
By London's Northern Line to Battersea | London Transport | |||
Battersea Northern Line extension now done with a loan? | London Transport | |||
Northern Line to Battersea Power Station | London Transport | |||
Northern Line Extension To Battersea | London Transport | |||
Northern line to battersea | London Transport |