Basil Jet wrote:
http://www.networkrailmediacentre.co...rk-is-required
http://www.barking-gospeloak.org.uk/...ss_release.pdf
It looks like NR is trying to pass the blame on to the contractors:
"Along the 14-mile route, a number of the structures, which carry the
overhead lines, were incorrectly designed and couldn’t be installed at the
planned locations. Late delivery of materials and structures also led to
further delays."
I think NR would have used different words if the faults had been its own.
TfL must be secretly relieved that this takes away the pressure to transfer
some old electric 4-car trains on to the line before the new class 710s
arrive.