Crossrail in trouble - again!
Graeme Wall wrote:
On 03/04/2019 15:11, Basil Jet wrote:
On 03/04/2019 11:47, Graeme Wall wrote:
https://www.bbc.co.uk/news/uk-england-london-47787367
"None of the stations are yet finished"
Surprising word order aside, that is staggering. How could every one of
them be running late? Weren't they built by different contractors?
I was rather confused by the statement that some sections were now
operating, I assume they were referring to testing, though Paddington -
Reading wasn't included
Liverpool St ("upstairs") - Shenfield and Paddington ("upstairs") - Hayes
are operated by TfL Rail using 345s; Padd-Heathrow stopper is operated by
TfL Rail using 360s.
Anna Noyd-Dryver
|