View Single Post
  #26   Report Post  
Old April 5th 19, 12:25 PM posted to uk.railway,uk.transport.london
Anna Noyd-Dryver Anna Noyd-Dryver is offline
external usenet poster
 
First recorded activity at LondonBanter: Jan 2015
Posts: 355
Default Crossrail in trouble - again!

Graeme Wall wrote:
On 03/04/2019 15:11, Basil Jet wrote:
On 03/04/2019 11:47, Graeme Wall wrote:
https://www.bbc.co.uk/news/uk-england-london-47787367


"None of the stations are yet finished"

Surprising word order aside, that is staggering. How could every one of
them be running late? Weren't they built by different contractors?


I was rather confused by the statement that some sections were now
operating, I assume they were referring to testing, though Paddington -
Reading wasn't included


Liverpool St ("upstairs") - Shenfield and Paddington ("upstairs") - Hayes
are operated by TfL Rail using 345s; Padd-Heathrow stopper is operated by
TfL Rail using 360s.


Anna Noyd-Dryver