Home |
Search |
Today's Posts |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
|
#1
|
|||
|
|||
Crossrail in trouble - again!
Graeme Wall wrote:
On 03/04/2019 15:11, Basil Jet wrote: On 03/04/2019 11:47, Graeme Wall wrote: https://www.bbc.co.uk/news/uk-england-london-47787367 "None of the stations are yet finished" Surprising word order aside, that is staggering. How could every one of them be running late? Weren't they built by different contractors? I was rather confused by the statement that some sections were now operating, I assume they were referring to testing, though Paddington - Reading wasn't included Liverpool St ("upstairs") - Shenfield and Paddington ("upstairs") - Hayes are operated by TfL Rail using 345s; Padd-Heathrow stopper is operated by TfL Rail using 360s. Anna Noyd-Dryver |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
The blog on Pc trouble shooting skills,Networking,Linux | London Transport | |||
Trouble finding a hotel! | London Transport | |||
Oyster trouble | London Transport | |||
A Little Trouble with my Oyster... | London Transport | |||
Driver in Trouble over Stone Throwers | London Transport |