East London Line extension news
Colin Rosenstiel wrote:
Would that be why the Watford-Brighton service, which also uses
platform 16 (?), is being dropped ?
Eh? Silverlink's West London Line trains currently terminate in platform
2, right the other end of the station. The plan is to relay the track in
platform 1 and use that too.
Marratxi is referring to the Southern service that uses Platform 16
which is being cut back/or axed, I'm not totally sure which.
--
Darren
|