The sub-surface lines were constructed using the "cut and cover"
method, usually following existing roads or the Thames Embankment.
Therefore most parts of the 'roof' directly support the road above (or
buildings) and therefore might be considered to be 'bridges' or
'structures' rather than 'tunnels'.