"Peter Lawrence" wrote in message
...
LU have announced that Herts CC have made a 'final' submission to the
DfT for funding for this project. The total cost is £65M (or ws last
year) and TfL is contributing £18M of this.


Is there a map showing the route of the link between the LU branch to
Watford LU and the disused Railtrack branch to Croxley Green? I presume that
Watford LU will be taken out of use, in the same way that Charing Cross
(Jubilee) is now redundant after the extension to Westminster and beyond.