TPWS & LUL resignalling
In article , Andy
writes
In the year dot Westinghouse are going to resignal the SSL lines and
introduce ATP. What will happen to places like the Richmond branch which are
owned by national rail. Will the new trains have to be fitted with TPWS to
run? I believe it is not a issue at the moment because of tripcocks are
fitted everywhere but presumably they will go with the new infastructure.
Any ATP system will provide a trainstop function, which means that TPWS
will not be required.
Compare the Tyne & Wear Metro, which doesn't have TPWS either.
--
Clive D.W. Feather | Home:
Tel: +44 20 8495 6138 (work) | Web: http://www.davros.org
Fax: +44 870 051 9937 | Work:
Please reply to the Reply-To address, which is:
|