View Single Post
  #9   Report Post  
Old October 10th 07, 02:24 PM posted to uk.transport.london
Paul Scott Paul Scott is offline
external usenet poster
 
First recorded activity at LondonBanter: Nov 2004
Posts: 2,029
Default Shepherd's Bush WLL


"John B" wrote in message
oups.com...
On 10 Oct, 11:55, wrote:
Sounds like utter ********, which wouldn't be surprising given the
general ****poor quality of the Eye's railway reporting. A fiver says
it opens with LO branding and the current platform length on November
11.


Its been mentioned somewhere a few weeks ago which I can't find at the
mo,
and it isn't the length, its the width, the yellow line is in the
middle of
the platform...


That's slightly saner - the '18 inches of length' point as reported in
the Eye made no sense whatsoever, but I can see that adding 45cm of
width to a full-length platform could be an expensive undertaking, and
that a narrow platform might actually be dangerous (whereas a short
platform can be dealt with by SDO). In which case, somebody involved
with the design needs shot.


I'm not sure which is 'up' or 'down', but I'm sure its the western side
platform that is the problem. The bit where the stairs and lifts come down
is quite deep, possibly for about a coach length, but to the north of that
it is quite narrow, and the back wall is quite substantial, I wonder if it
is supporting the higher ground of the bus station?

Dave Arquati's site links to some photos, which seem to predate the
retaining wall going in:

http://www.flickr.com/photos/davearq...7594243368848/

Paul