View Single Post
  #11   Report Post  
Old April 9th 08, 05:18 PM posted to uk.railway,uk.transport.london
Mr Thant Mr Thant is offline
external usenet poster
 
First recorded activity at LondonBanter: Mar 2007
Posts: 973
Default Thameslink NGEMU procurement - now in motion

On 9 Apr, 15:01, Roland Perry wrote:
I have given up (apart from to odd heckle from the sidelines like today)
tracking the numbers. Especially when people say this 1100 might be on
top of an earlier 1300, and I was only trying to track a different 1000.


The problem is the Rolling Stock Plan (the 1300) only covers until ca.
2014, which means only the first batch of NGEMU are included in it
(the 1100, due in 2015) . Roger Ford says 100 carriages.

U

--
http://londonconnections.blogspot.com/
A blog about transport projects in London