On 4 Jun, 10:12, wrote:
I wonder if theres an argument for extending the 3rd rail to kentish
town so dual voltage stock isn't required.
It wouldn't be very useful. The interim arrangement is more about
having somewhere to send the peak services from the north with the
Moorgate branch gone. There's not really anywhere to terminate them,
so running them through as services to Kent (replacing the SET
Blackfriars services) is the only real option.
U
--
http://londonconnections.blogspot.com/
A blog about transport projects in London