Home |
Search |
Today's Posts |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#4
|
|||
|
|||
Blackfriars - SET services after December 2008
On 4 Jun, 10:12, wrote:
I wonder if theres an argument for extending the 3rd rail to kentish town so dual voltage stock isn't required. It wouldn't be very useful. The interim arrangement is more about having somewhere to send the peak services from the north with the Moorgate branch gone. There's not really anywhere to terminate them, so running them through as services to Kent (replacing the SET Blackfriars services) is the only real option. U -- http://londonconnections.blogspot.com/ A blog about transport projects in London |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
6 Thameslink services to avoid after March 2009 | London Transport | |||
Withdrawal of Off Peak Inter-City services from Watford Junction to North West - Dec 2008 | London Transport | |||
SET 376 - A big disappointment | London Transport | |||
376 diagrams on SET website | London Transport | |||
LUL set to close Met line | London Transport |