St Pancras Low Level
On 3 Apr, 11:26, Roland Perry wrote:
In message , at 11:35:14 on Fri, 3
Apr 2009, Paul Terry remarked:
The northernmost part is cut and cover, but the rest was always planned
as bored.
And if, as some suspect, they never see traffic as a result of cutbacks
- they'll always be bored.
--
Roland Perry
Cutbacks to which programme, Thameslink? Is that really likely? Surely
now that the tunnels are built, the connection to ECML isn't that
extensive?
I did wonder how well the flat junction onto the ECML would work
though.
|