London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #9   Report Post  
Old April 3rd 09, 01:23 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Mar 2009
Posts: 8
Default St Pancras Low Level

On 3 Apr, 11:26, Roland Perry wrote:
In message , at 11:35:14 on Fri, 3
Apr 2009, Paul Terry remarked:

The northernmost part is cut and cover, but the rest was always planned
as bored.


And if, as some suspect, they never see traffic as a result of cutbacks
- they'll always be bored.
--
Roland Perry


Cutbacks to which programme, Thameslink? Is that really likely? Surely
now that the tunnels are built, the connection to ECML isn't that
extensive?

I did wonder how well the flat junction onto the ECML would work
though.
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Delays expected as work on level crossing begins burkey London Transport 2 March 4th 05 04:58 PM
Putting roof-level railways underground? Michael Bell London Transport 17 December 30th 04 05:38 PM
London's busiest level crossing? [email protected] London Transport 37 December 18th 04 10:36 PM
Level Crossings on busy lines Richard J. London Transport 15 April 26th 04 01:57 PM
level crosings on the LUL IanB London Transport 52 December 22nd 03 04:46 PM


All times are GMT. The time now is 11:10 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017